SAMSUNG Proprietary-Contents may change without notice
Exploded View and Parts List
11-5
This Document can not be used without Samsung's authorization
1) Put them follow the baselines.
1) Be careful to occur any damages and scratches to
the injections
1) Be careful to occur any damages and scratches on
the FPCB.
1) Use appropriate screws.
2) Be careful not to occur any damages to the
injection during screwing.
1) Be careful not to occur any damages and scratches
to the FPCB.
7
8
1) Screw the 5 screw point.
1) Through the SLIDE FPCB into the groove
of the FRONT.
7
8
1) Confirm the baselines of all connectors
2) Put the SUB PBA friction tape.
1) Lift the hinge and put the lower on.
Pay attention to the screw hole during the
assembly.
①
①
②
- Torque : 1.0~ 1.2 Kgf·cm
- Size : M1.4*L3.0
- Torque : 0.8~ 1.0 Kgf·cm
- Size : M1.4*L1.7