SAMSUNG Proprietary-Contents may change without notice
Exploded View and Parts List
11-6
This Document can not be used without Samsung's authorization
- Torque : 1.0~ 1.2 Kgf·cm
- Size : M1.4*L3.0
1) Be careful not to occur any damages to the
injection during screwing.
2) Put the SLIDE FPCB appropriately follow left/right
grooves.
1) Be careful not to occur any damages to the FPCB.
2) Be careful not to occur any damages to components
around screw points during screwing.
- Torque : 1.0~ 1.2 Kgf·cm
- Size : M1.4*L3.0
1) Be careful not to occur any damages to the
injection during the screwing.
1) Check the appearance.
10
9
1) Put the PBA on and connect the SLIDE FPCB
Connector.
2) Screw the right side of the CAMERA and
left side of the RF SW.
1) Screw the 8 screw points.
2) Put the SLIDE FPCB on the FRONT. (Double
sided tape)
1) Assemble the REAR
2) Screw 6 screw points.
11
1) Confirm the appearance and functions.
12
- Torque : 0.8~ 1.0 Kgf·cm
- Size : M1.4*L1.7