10
EEV Kit installation
Connection of refrigerant piping & Insulation
1.
Insert bot anchors, use existing ceiling supports or construct a suitable
support.
• Ensure the ceiling is strong enough to support the weight
of the indoor unit. Before hanging the unit, test the
strength of each attached suspension bolt.
CAUTION
2.
Connect the “IN” refrigerant pipe to the outdoor unit.
3.
Connect the “OUT” refrigerant pipe to each indoor unit (A, B and C).
• The liquid and gas pipes should not be crossed when piping
connection.
4.
Insulate the connection piping. A joint part of pipe needs double
thickness of insulation.
5.
The EEV kit has to be installed that the user has no access to it. (built-in
type)
EE
V K
it body
Nylon band
Содержание AM FNCD Series
Страница 40: ......