15
Ins
tallation Pr
oc
edur
e
English
Gas
refrigerant port
Drain hose
connection port
Liquid
refrigerant port
NOTE
•
The designs and shape are subject to change
according to the model.
Step 8 Performing the gas leak test
To identify potential gas leaks on the indoor unit, inspect
the connection area of each refrigerant pipe using a leak
detector for R-410A.
Before recreating the vacuum and recirculating the
refrigerant gas, pressurize the whole system with
nitrogen (using a cylinder with a pressure reducer) at a
pressure above 4 MPa in order to immediately detect
leaks on the refrigerant fittings.
Made vacuum for 15 minutes and pressurizing system
with nitrogen.
Insulator
Gas side
Liquid side
Step 9 Insulating the refrigerant pipes
Once you have checked that there are no leaks in the
system, you can insulate the piping and hose.
1
To avoid condensation problems, place Acrylonitrile
Butadien Rubber separately around each refrigerant pipe.
No gap
NBR
NOTE
•
Always make the seam of pipes face upwards.
Содержание AE071MNMPEH
Страница 40: ......