Samsung Electronics
5-11
5-3-7 When the 4 way valve (A,B) is not operating
1. Inspection items
(1) A re the 4 way valve A and B under the operating conditions?
(When the COMP A (4 way valve A ) and COMP B (4 way valve B) are on during the
heating operating)
(2) Is the power voltage normal?
(3) Is the connecting of 4 way valve A (CN 75) and B (CN 76) good?
2) Inspection sequence
*4 way valve operating conditions
(1) During the defrost control, put the 4 way valve A(B) off .
(2) During the heating operation put the 4 way valve A(B) on.
(3) The changeover of heating to cooling : put the 4 way valve off immediately (in case of B and C
ro o m ) .
(4) The changeover of cooling to heating : it is on after 170 seconds delay.
Put off the outdoor unit power and put it on again after 5 seconds.
Select the heating operation of A(B) room by the remote controller.
Normal
Keep 4 way valve off.
Normal
Defect of RY 76 (RY 77) contact and coil
→
Replace
the Relay
Defect of IC 06 (IC 07 ) output
→
Replace
Defect of IC 04(MICOM) - replace the IC 04 or PCB
ass’y
Has 3 minutes passed after selection of A(B) room heating?
Is the 4 way valve A(B) on?
Is the pin no 47(46) of IC 04 ( MICOM) at high (DC 5V) ?
Is the 4 way valve A (B) under operating conditions?
Is the voltage shown across the 4 way valve A(B) connector
(CN 75, CN 76) ?
Y
Y
Y
Y
Y
N
N
N
N
N
Troubleshooting
Содержание AD18A1(B1)E09
Страница 2: ... Samsung Electronics Co Ltd NOV 1998 Printed in Korea Code No DB81 10179A 1 ...
Страница 4: ...1 2 Samsung Electronics MEMO ...
Страница 26: ...3 18 Samsung Electronics MEMO ...
Страница 42: ...Samsung Electronics 6 1 6 Exploded Views and Parts List 6 1 Indoor Unit ...
Страница 50: ...Samsung Electronics 7 1 7 PCB Diagrams 7 1 Main PCB ...
Страница 54: ...Samsung Electronics 8 2 8 2 Outdoor Unit UD24A1 B1 E2 UD18A1 B1 E2 UD19A1 B1 E2 ...
Страница 56: ...Samsung Electronics 9 1 9 Schematic Diagrams 9 1 Indoor Unit ...
Страница 57: ...9 2 Remote Control Samsung Electronics 9 2 ...