Samsung Electronics
3-9
Installation of drain line
Grounding
In heating and ”de-ice” operation, condensed
water may be generated.
Install drain line as following pro c e d u re .
1. Insert drain plug into hole and then connect
drain hose to drain plug.
•
Inside diameter of drain hose is 18mm
(The parts for this work are optional)
• A g rounding terminal can be found on
the outdoor unit as illustrated.
2 . Use of a grounding electro d e .
•
Specifications of grounding electro d e .
1 . When an existing grounding terminal is avil-
a b l e .
( G rounding wire of ø1.6mm or larg e r < s o l i d
w i re>or 2mm
2
or larger <standard wire>)
Terminal used
exclusively for
grounding
Carbon plastic
Steel core
PVC-insulated wire(2mm
2
x3.5m), green
Terminal, M4
Grounding resistance:
less than 100 ohms
(existing grounding electrode)
Drain hole
Drain plug
Grounding screw hole
Operating Instructions and Installation
Содержание AD18A1(B1)E09
Страница 2: ... Samsung Electronics Co Ltd NOV 1998 Printed in Korea Code No DB81 10179A 1 ...
Страница 4: ...1 2 Samsung Electronics MEMO ...
Страница 26: ...3 18 Samsung Electronics MEMO ...
Страница 42: ...Samsung Electronics 6 1 6 Exploded Views and Parts List 6 1 Indoor Unit ...
Страница 50: ...Samsung Electronics 7 1 7 PCB Diagrams 7 1 Main PCB ...
Страница 54: ...Samsung Electronics 8 2 8 2 Outdoor Unit UD24A1 B1 E2 UD18A1 B1 E2 UD19A1 B1 E2 ...
Страница 56: ...Samsung Electronics 9 1 9 Schematic Diagrams 9 1 Indoor Unit ...
Страница 57: ...9 2 Remote Control Samsung Electronics 9 2 ...