
13
Ins
tallation Pr
oc
edur
e
English
Pipe
Pipe size
(mm)
Insulation type (heating/cooling)
Remarks
Standard
(Less than 30°C,
85%)
High humidity
(Over 30°C, 85%)
EPDM, NBR (mm)
Liquid
pipe
Ø6.35 to
Ø9.52
9t
9t
The internal
temperature
is higher
than 120°C.
Ø12.7 to
Ø19.05
13t
13t
Gas
pipe
Ø6.35
13t
19t
Ø9.52
19t
25t
Ø12.70
Ø15.88
Ø19.05
ŷ
When installing insulation in the places and
conditions below, use the same insulation that is
used for high humidity conditions.
<Geological condition>
High humidity locations such as shorelines, hot
springs, lake or riversides, and ridges (when part of
the building is covered by earth and sand)
<Operation purpose condition>
Restaurant ceiling, sauna, swimming pool etc.
<Building construction condition>
Ceilings frequently exposed to moisture and cooling
are not covered. For example, pipes installed at a
corridor of a dormitory and studio or near an exit that
opens and closes frequently.
Places (where the pipes are installed) that are highly
humid due to a lack of ventilation.
Step 10 Installing the drain hose and
drain pipe
1
Push the supplied drain hose as far as possible over
the drain socket.
2
Tighten the metal clamp as shown in the picture.
3
Wrap the supplied large sealing pad over the metal
clamp and drain hose to insulate and fix it with
clamps.
4
Insulate the complete drain piping inside the building
(field supply).
If the drain hose cannot be sufficiently set on a slope,
fit the hose with drain raising piping (field supply).
5
Push the drain hose up to insulation when connecting
the drain hose to drain socket.
Metal clamp
Drain socket
Drain hose
Large seailng pad
Be sure to bond the drain
hose and the main pipe.
Drain pipe
Drain hose
PVC Tube Joint
+ VP25 (OD: 32 mm, ID: 25 mm)
Drain pipe
Содержание AC100RN4PKG
Страница 38: ...This appliance is filled with R 32 ...