14
Installation Procedure
English
Ins
tallation Pr
oc
edur
e
6
Apply heat to the contraction tube to contract it.
Contraction tube
7
After tube contraction work is completed, wrap it with
the insulation tape to finish.
CAUTION
• Make sure that the connection parts are not exposed
to outside.
• Be sure to use insulation tape and a contraction tube
made of approved reinforced insulating materials that
have the same level of withstand voltage with the
power cable. (Comply with the local regulations on
extensions.)
Insulation tape
WARNING
• In case of extending the electric wire, please DO NOT
use a round-shaped Pressing socket.
– Incomplete wire connections can cause electric
shock or a fire.
Step 5 Connecting the refrigerant pipe
Items
Maximum allowable length
Outdoor unit
models
AC071KXAPEH
AC071KXADEH
AC100KXAPEH
AC100KXADGH
AC125KXAPEH
AC140KXAPEH
AC140KXADGH
Main pipe (L1)
50 m
75 m
Max. height
difference
between outdoor
and indoor units
(h1)
30 m
30 m
L
1
h
1
n=1
indoor
Outdoor
• Temper grade and minimum thickness of the
refrigerant pipe
Outer diameter
[mm]
Minimum
thickness [mm]
Temper grade
ø6.35
0.7
C1220T-O
ø9.52
0.7
ø12.70
0.8
ø15.88
1.0
ø15.88
0.8
C1220T-1/2H OR
C1220T-H
ø19.05
0.9
ø22.23
0.9
360_AC_Outdoor_AU_Eng_EN.indb 14
2016-09-20 오후 8:00:32