13
English
Installation Pr
oc
edur
e
<Geological condition>
High humidity locations such as shorelines, hot springs, lake or
riversides, and ridges (when part of the building is covered by
earth and sand)
<Operation purpose condition>
Restaurant ceiling, sauna, swimming pool etc.
<Building construction condition>
Ceilings frequently exposed to moisture and cooling are
not covered. For example, pipes installed at a corridor of a
dormitory and studio or near an exit that opens and closes
frequently.
Places (where the pipes are installed) that are highly humid
due to a lack of ventilation.
Step 10 Installing the drain hose and
drain pipe
1
Push the supplied drain hose as far as possible over
the drain socket.
2
Tighten the metal clamp as shown in the picture.
3
Wrap the supplied large sealing pad over the metal
clamp and drain hose to insulate and fix it with clamps.
4
Insulate the complete drain piping inside the building
(field supply).
If the drain hose cannot be sufficiently set on a slope,
fit the hose with drain raising piping (field supply).
5
Push the drain hose up to insulation when connecting
the drain hose to drain socket.
Metal clamp
Drain socket
Drain hose
Drain pipe
Be sure to bond the drain
hose and the main pipe.
Large seailng pad
Drain hose
PVC Tube Joint
+ VP25 (OD: 32 mm)
Drain pipe
CAUTION
Check that the indoor unit is level with the ceiling by
using the leveller.
• Install air ventilation to drain condensation smoothly.
Ceiling
Air ventilation
• If it is necessary to increase the height of the drain
pipe, install the drain pipe straight within 300 mm
from the drain hose port. If it is raised higher than 550
mm, there may be water leaks.
Drain hose
20 mm or more
1/100 or more
550 mm or less
300 mm or less
Ceiling
Band joint