EB 6495-2 EN
147
++
PIDPID
--
SPESPE
SPCSPC
PVPV
YY
C.2.2.2C.2.2.2
C.2.1.2C.2.1.2
C.3.1.1C.3.1.1
PV0PV0
SP0SP0
ee
C.1.1.1C.1.1.1
C.1.3.1C.1.3.1
M.1-2M.1-2
RR
atio
control
atio
control
RR
atio
controller
[1]
atio
controller
[1]
DVDV
PVRPVR
SPRSPR
C.1.2.1C.1.2.1
C.2.1.1C.2.1.1
SP1/2/3/4SP1/2/3/4
ExternalExternal
rratio
set
point
atio
set
point
Actual
r
Actual
ratioatio
RR
atio
set
point
atio
set
point
ControlledControlled
vv
ariableariable
Leading
process
v
Leading
process
v
ariableariable
Set
point
Set
point
ActualActual
vv
aluealue
InternalInternal
rratio
set
point
atio
set
point
RR
atio
formula
C
.2.1.3-1
atio
formula
C.2.1.3-1
PVPV
DVDV
*K11*K11
RR
atio
=
atio
=
Ext.
set
point
Ext.
set
point
via
interface
via
interface
K11K11
I.1.1I.1.1
1111
1212
1313
AI1AI1
I.2.1I.2.1
1515
1616
1717
AI2AI2
I.3.1I.3.1
1919
2020
2121
AI3AI3
I.4.1I.4.1
2323
2424
2525
AI4AI4
Pt
100/
Pt
100/
Pt
1000/
Pt
1000/
mA/VmA/V
Pt
100/
Pt
100/
Pt
1000/
Pt
1000/
mA/V/RmA/V/R
Pt
100/
Pt
100/
Pt
1000/
Pt
1000/
mA/VmA/V
Pt
100/
Pt
100/
Pt
1000/
Pt
1000/
mA/VmA/V
AO1AO1
AO2AO2
AO3AO3
SO1SO1
SO2SO2
mA/VmA/V
3-step3-step
on-offon-off
3-step3-step
on-offon-off
OO
.3.3.3.3
OO
.3.2.3.2
OO
.4.3.4.3
OO
.4.2.4.2
OO
.5.3.5.3
OO
.5.2.5.2
3131
3232
3333
OO
.1.3.1.3
OO
.1.2.1.2
mA/VmA/V
mA/VmA/V
OO
.2.3.2.3
OO
.2.2.2.2
3535
3636
3737
9797
9898
9999
4242
4343
5252
5353
4545
4646
5555
5656
OO
.1.1.1.1
OO
.2.1.2.1
OO
.3.1.3.1
OO
.5.1.5.1
OO
.4.1.4.1
TT
erminalserminals
TT
erminalserminals
Note:
Other
ratio
formulas
can
be
selected.
Содержание TROVIS 6495 Series
Страница 154: ...154 EB 6495 2 EN...
Страница 155: ...EB 6495 2 EN 155...