5-5
EB
|
14t_EN
June 2023 edition
Subject to technical changes
Installation
Upon request, the After Sales Service can provide you with sup-
port for the planning and implementation of a leak test speci
fi
c to
your plant. Contact PFEIFFER.
The tightness of the packing, bonnet,
fl
ange and optional body
extension must be checked.
In the case of impermissible leakage, proceed as follows:
Tighten the packing (8)
Ö
Tighten the stuf
fi
ng box nuts (56) alternately and evenly using
the speci
fi
ed torques, see Chapter “15.1.1 Tightening tor-
ques”. Avoid tilting
Figure
|
5-3:
Correct tightening of the packing
Ö
Open and close the valve completely multiple times, if possi-
ble.
Ö
Repeat steps 1 and 2 until the required tightness is achieved.
Functional impairment of the butter
fl
y valve due to increased
friction resulting from an excessively tightened stuf
fi
ng box!
Ö
Make sure that the actuator shaft is able to move smoothly af-
ter tightening the stuf
fi
ng box.
Ö
If the adjustable packing is not correctly sealed, contact
PFEIFFER.
Tighten the bonnet (7)
Ö
Tighten the bonnet screws (53) with the speci
fi
ed tightening
torque, see Chapter “15.1.1 Tightening torques”.
Ö
In the case of insuf
fi
cient tightness, contact PFEIFFER.
Tip
NOTE
Tightening the
fl
ange
Ö
Tighten the
fl
ange screws with the speci
fi
ed torque.
Ö
If the seal is not suf
fi
cient, the
fl
anges and
fl
ange seals must
be checked for damage and replaced if necessary.
Optional body extension (15) (insulation part)
Ö
Tighten the nuts (63) with the speci
fi
ed tightening torque, see
Chapter “15.1.1 Tightening torques”.
Ö
In the case of insuf
fi
cient tightness, contact PFEIFFER.
5.4.2 Checking the rotary movement
The rotary movement of the actuator shaft must be even (smooth).
5.4.3 Checking the fail-safe position
It must be checked if the valve moves to the fail-safe position in-
dicated on the actuator type plate, see Chapter “3 Design and
principle of operation”.
Содержание BR 14t - LTR 43
Страница 10: ...2 2 EB 14t_EN June 2023 edition Subject to technical changes Markings on the device...
Страница 14: ...3 4 EB 14t_EN June 2023 edition Subject to technical changes Design and principle of operation...
Страница 18: ...4 4 EB 14t_EN June 2023 edition Subject to technical changes Shipment and on site transport...
Страница 24: ...5 6 EB 14t_EN June 2023 edition Subject to technical changes Installation...
Страница 26: ...6 2 EB 14t_EN June 2023 edition Subject to technical changes Start up...
Страница 28: ...7 2 EB 14t_EN June 2023 edition Subject to technical changes Operation...
Страница 30: ...8 2 EB 14t_EN June 2023 edition Subject to technical changes Malfunction...
Страница 36: ...9 6 EB 14t_EN June 2023 edition Subject to technical changes Servicing...
Страница 38: ...10 2 EB 14t_EN June 2023 edition Subject to technical changes Decommissioning...
Страница 40: ...11 2 EB 14t_EN June 2023 edition Subject to technical changes Removal...
Страница 42: ...12 2 EB 14t_EN June 2023 edition Subject to technical changes Repairs...
Страница 44: ...13 2 EB 14t_EN June 2023 edition Subject to technical changes Disposal...
Страница 46: ...14 2 EB 14t_EN June 2023 edition Subject to technical changes Certificates...
Страница 47: ...14 3 EB 14t_EN June 2023 edition Subject to technical changes Certificates...
Страница 48: ...14 4 EB 14t_EN June 2023 edition Subject to technical changes Certificates...
Страница 53: ...EB 14t_EN June 2023 edition Subject to technical changes...
Страница 54: ...EB 14t_EN June 2023 edition Subject to technical changes...
Страница 55: ...EB 14t_EN June 2023 edition Subject to technical changes...