16
EB 8139 EN
Measures for preparation
4 Measures for preparation
After receiving the shipment, proceed as fol-
lows:
1. Check the scope of delivery. Compare
the shipment received against the deliv-
ery note.
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent
(refer to delivery note).
4.1 Unpacking
Do not remove the packaging until immedi
-
ately before installing the valve into the pipe
-
line.
Proceed as follows to lift and install the con-
trol valve:
1. Remove the packaging from the control
valve.
2. Dispose of the packaging in accordance
with the valid regulations.
4.2 Transporting and lifting
Due to the low service weight, lifting equip-
ment is not required to lift and transport the
control valve (e.g. to install it into the pipe-
line).
Transport instructions
−
Protect the control valve against external
influences (e.g. impact).
−
Do not damage the corrosion protection
(paint, surface coatings). Repair any
damage immediately.
−
Protect the control valve against moisture
and dirt.
−
Observe the permissible ambient tem-
peratures (see section 3.2).
4.3 Storage
Risk of valve damage due to improper stor
-
age.
−
Observe storage instructions.
−
Avoid long storage times.
Contact SAMSON in case of different stor
-
age conditions or long storage periods.
We recommend regularly checking the con
-
trol valve and the prevailing storage condi
-
tions during long storage periods.
Storage instructions
−
Protect the control valve against external
influences (e.g. impact).
−
Do not damage the corrosion protection
(paint, surface coatings). Repair any
damage immediately.
−
Protect the control valve against moisture
and dirt. Store it at a relative humidity of
less than 75 %. In damp spaces, prevent
condensation. If necessary, use a drying
agent or heating.
Note
NOTICE
!
Note