
www.larius.com
12
I4
zEus for sanitation
REV
. 01 - 05/2020 - Cod. 150125
Should anyone use an extension cable between
the tooling and the socket, it must have the same
characteristics as the cable supplied (
minimum
diameter of the wire 4 mm
2
) with a maximum length
of 50 mt. Higher lengths and lower diameters can
provoke excessive voltage falls and also an ano-
malous working of the equipment.
• Check the mains voltage corresponds to the equipment’s
rating.
• The supply cable is provided without plug.
Use a plug which guarantees the plant earthing.
Only a technician or a skilled person should perform the
connection of the plug to the electric cable.
To avoid electric shock when disassembling or checking the
electronic equipment, wait 5 minutes after having disconnected
the power supply cable, so that the electricity stored in the con
-
densers while working can be dissipated.
Also check the condition of the earth cable to avoid any risk of
shock.
zEUS
equipment is fitted with an additional external earth cable
that is connected to the stem on the pump unit be means of a
specific clamp (
I4
), in order to protect the operator against any
risk of static or electric shock.
CONNECTION OF THE TOOLING TO THE POWER SUPPLY
• Check the switch (
I5
) is on the “
OFF
”
(0)
position before
connecting the cable to the mains.
•
Place the pressure control knob (
I6
) on the “
MIN
” position
(
turn counterclockwise
).
Before carrying out any checks on the machine
(
maintenance, cleaning, or replacing parts
) switch
off the machine and wait until it has stopped al-
together.
While checking stay away from electrical or moving
parts to avoid any risk of shock or crushing of hands.
• DO NOT modify the plug for the earth socket
in any way.
• ONLY use electrical connections that are
earthed.
• Make sure that any earth extension cords
are in good condition.
• ONLY use three-core extension cables.
• Avoid direct contact with the rain. Keep the
equipment in a dry place.
Before connection up the power supply to the
equipment, make sure that the electrical system
is earthed and complies with regulations.
Make sure that the clamp (I4) provided is posi-
tioned correctly, in order to earth the pump unit
in the equipment properly.
Содержание Larius Zeus 110 V
Страница 7: ...www larius com 5 C A B D zeus for sanitation REV 01 05 2020 Cod 150125...
Страница 9: ...www larius com 7 6 8 9 3 10 4 zeus for sanitation REV 01 05 2020 Cod 150125...
Страница 37: ...www larius com 35 zeus for sanitation REV 01 05 2020 Cod 150125 I n t e n t i o n a l l y b l a n k p a g e...