ALARM MESSAGE TABLE
Alarm symbol
Type of alarm
Cause
Solution
F1
Maximum current
The motor’s current absorption is
too high
Check the mechanical and hydraulic
condition of the equipment. If
necessary, take action
F2
Dissipator temp
The dissipator temperature is too
high
Check that the dissipator surfaces
are clean and that the dissipator is
properly ventilated
F3
Motor temp
The motor temperature is too high
Check that the motor’s heat
dissipation surfaces are clean.
Check that cooling ventilation is
correct
F4
Maximum voltage
The voltage is too high
Check the connection to the
electrical line and reinstate the
correct nominal voltage
F5
Minimum voltage
The voltage is too low
Check the connection to the
electrical line and reinstate the
correct nominal voltage
F6
Earth connection
The earth connection is
disconnected or non-existent
Check the earth cable and, if
necessary, replace it. Make sure
that the machine is earthed
F7
Pressure sensor missing
The pressure sensor is damaged or
not fitted
Replace it
F8
Automatic switch-off during
circulation phase (15 minutes)
The equipment is in cleaning mode
Wait until the equipment has
stopped completely before using it
for a new job
• The packed parts should be handled as indicated in the
symbols and markings on the outside of the packing.
• Before installing the equipment, ensure that the area to be
used is large enough for such purposes, is properly lit and
has a clean, smooth floor surface.
• The user is responsible for the operations of unloading and
handling and should use the maximum care so as not to
damage the individual parts or injure anyone.
To perform the unloading operation, use only qualified and
trained personnel (truck and crane operators, etc.) and also
suitable hoisting equipment for the weight of the installation
or its parts. Follow carefully all the safety rules.
The personnel must be equipped with the necessary safety
clothing.
• The manufacturer will not be responsible for the unloading
operations and transport to the workplace of the machine.
LIFTING POINTS
There are no precise lifting points for the machine in its entirety. In
order to determine the most appropriate lifting points, refer to the
geometric characteristics of the machine itself (
proceed as shown
).
• Check the packing is undamaged on receipt of the equipment.
Unpack the machine and verify if there has been any damage
due to transportation.
TRANSPORT AND UNPACKING
Содержание Larius Zeus 110 V
Страница 7: ...www larius com 5 C A B D zeus for sanitation REV 01 05 2020 Cod 150125...
Страница 9: ...www larius com 7 6 8 9 3 10 4 zeus for sanitation REV 01 05 2020 Cod 150125...
Страница 37: ...www larius com 35 zeus for sanitation REV 01 05 2020 Cod 150125 I n t e n t i o n a l l y b l a n k p a g e...