28
28 | SAMLEX AMERICA INC.
foR 12V BATTERY:
500 Ah ÷ 0.8 = 625 Ah (note that the actual energy required by the load was 300 Ah).
foR 24V BATTERY:
250 Ah ÷ 0.8 = 312.5 Ah (Note that the actual energy required was 150 Ah).
It will be seen from the above that the final rated capacity of the batteries is almost
2 times the energy required by the load in Ah. Thus, as a Rule of Thumb, the Ah
capacity of the batteries should be twice the energy required by the load in Ah.
7.17 cHARGinG BAtteRieS
batteries can be charged by using good quality AC powered battery charger or from
alternative energy sources like solar panels, wind or hydro systems. Make sure an ap-
propriate battery Charge Controller is used. It is recommended that batteries may be
charged at 10% to 13% of their Ah capacity (Ah capacity based on C-rate of 20 Hr
Discharge Time). Also, for complete charging (return of 100% capacity) of Sealed Lead
Acid battery, it is recommended that a 3 Stage Charger may be used (Constant Current
Bulk Charging Stage
}
Constant Voltage Boost / Absorption Charging
}
Constant Voltage
float Charging).
In case, Wet Cell / flooded Batteries are being used, a 4-stage charger is recommended
(Constant Current Bulk Charging Stage
}
Constant Voltage Boost / Absorption Stage
}
Constant Voltage equalization Stage
}
Constant Voltage float Stage).
seCtIOn 8 |
Installation
WARNING!
1. Before commencing installation, please read the safety instructions explained
in the Section 1 titled “Safety Instructions”.
2. It is recommended that the installation should be undertaken by a qualified,
licensed / certified electrician.
3. Various recommendations made in this manual on installation will be super-
seded by the National / Local Electrical Codes related to the location of the
unit and the specific application.
seCtIOn 7 |
General Information on lead Acid
Batteries
28
Содержание PST-300S-12E
Страница 102: ...102 51 OPMERKINGEN 102...
Страница 153: ...153 HINWEISE 153...
Страница 184: ...184 SECTION 8 Installation 31 NOTE Dimensions en mm Fig 8 1 Dimensions g n rales rainures de montage du PST 300S 184...
Страница 204: ...204 51 NOTES 204...
Страница 255: ...255 51 NOTAS 255...
Страница 256: ...256 256 www samlex com www samlex solar com 256...