background image

 
 
 

 
 

Doc.-ID: 200917-PT08BA-ES-ExCam IPP1275_en_rev.00.docx, Page 10 of 28 

to  be  mounted  with  suitable  screws  (please  observe  the  Ex-Installationmanual  T04). 
Consider the weight of the housing. 
 
Drawings  for  drill  hole  patterns  and  further  information  can  be  viewed  on  our  product 
page: 
 
Quick link: 

https://www.samcon.eu/en/products/network/excam-ipp1275/

 

 
 
 
 

Optional mounting accessories 

 

Wall bracket 
WMB-... 

 

WALL MOUNT EXCAM VA1.x 

Wall bracket for devices of T08-VA0-series  
Suitable for hanging the camera on walls.  
Material: stainless steel 1.4404 
Weight: 0.68 kg 
Dimensions: 80 x 100 x 205 mm 

Pole adapter 
PMB-

… 

 

POLE MOUNT EXCAM VA1.x (-) 

Pole apter for VA wall mount 
Material: stainless steel 1.4404 
Suitable for pole diameters  
between 50 and 105 mm 
Load-bearing capacity: 45 kg 
Dimensions:120x180x130 at masts of Ø 60 mm) 

 

Table 4-1 Mounting accessories 

 
 
 

 

Содержание ExCam IPP1275

Страница 1: ...ExCam IPP1275 User Manual...

Страница 2: ...Rail Routing into Ex d 14 5 2 4 Appropriate cables cable entries 16 5 2 5 Fusing 17 5 2 6 Tests prior to switching on voltage 17 6 Working inside the housings Ex d 18 6 1 Preparation for work 18 6 2 O...

Страница 3: ...ection Rail 14 Figure 5 6 Video Tutorial 15 Figure 5 7 BTR Modul 15 Figure 6 1 Opening the ExCam IPP1275 Fig similar 19 Figure 6 2 Structure oft he main unit P12 MkII 20 Figure 6 3 Open the ExConnecti...

Страница 4: ...ur website at www samcon eu en When designing the ExCam IPP1275 we attached a very high importance to safety me chanical precision and high quality of stainless steel 2 Technical data 2 1 Explosion pr...

Страница 5: ...VA0 1 K1 BOR T07 VA0 1 housing with minimum body length L R 127mm VA0 1 K1 BOR K1 cable gland flange VA0 1 K1 BOR Borosilicate sight glass DIN7080 standard for video cameras within visible spectral r...

Страница 6: ...us 8 x Da when installed and 4 x Da after installation Temperature 25 C 80 C during installation 60 C 80 C fixed installed Data line 4 x 2 x AWG24 7 blank CAT 6 Shielding Copper tinned wire 0 10 optic...

Страница 7: ...w axis com products axis p1275 2 6 Other technical data Table 2 2 Other technical data Sensor Unit Ex d Main Unit Permissible ambient temperature 20 C 50 C 20 C 50 C Protection class as per EN 60529 I...

Страница 8: ...tomer is not allowed to make any alterations of the camera The camera must be operated in a proper and sound condition and only in the way intended Attention Repairs may only be carried out by using o...

Страница 9: ...site carefully consider light conditions object distance or size angle and minimum object distance to the focus Use appropriate tools and aids When working ensure a safe stand Make sure that any stati...

Страница 10: ...oducts network excam ipp1275 Optional mounting accessories Wall bracket WMB WALL MOUNT EXCAM VA1 x Wall bracket for devices of T08 VA0 series Suitable for hanging the camera on walls Material stainles...

Страница 11: ...quipped with an electrical connection cable of the type SKD04 T flex The maximum transmission range from the camera to the next active network interface is 25 meters and can be individually specified...

Страница 12: ...r supply for the camera PoE Voltage supply PoE IEEE 802 3af 802 3at type 1 class 2 Reference voltage 4 V DC Maximum power consumption 4 0 W Typical power consumption 2 5 W The figures 5 2 and 5 3 illu...

Страница 13: ...is suggested connecting the Sensor Unit with the Main Unit prior to powering the Main Unit If the Sensor Unit will be unplugged and then re connected it is possible that the Main Unit needs to be rebo...

Страница 14: ...leiter PoE 48 VDC BU 6 0 23 mm2 Massivleiter PoE GND WH BN 7 0 23 mm2 Massivleiter PoE GND BN 8 0 23 mm2 Massivleiter GND SHD PE PE Table 5 2 Aderbelegung des RJ12 Steckers SKD04 T flex Particularly i...

Страница 15: ...eo Tutorial Via the system cable the digital video stream is transferred via IP TCP RTSP protocol levels and the camera module is controlled and or parametrized via the web interface or the video mana...

Страница 16: ...of the IEC 60079 0 1 7 14 Attention The supply line must have a sufficient cross section The cable pro tection must comply with national and international regulations 5 2 4 Appropriate cables cable en...

Страница 17: ...hing on voltage Attention Prior to starting the device perform all tests as indicated by the na tional regulations Furthermore check the correct function and instal lation of the device in accordance...

Страница 18: ...ain a work approval first If you adjust the camera yourself or open the pressure resistant en closure Ex d under voltage it is absolutely imperative to prevent po tentially explosive atmosphere 6 2 Op...

Страница 19: ...It is not permitted for the customer to open the front side sight glass flange There is no need of such an action Carefully pull out the cable and supply flange to the rear as straight as possible Be...

Страница 20: ...a memory card or to reset the hardware For opening the ExConnection Rail T04 2 of the ExCam IPP1275 it is mandatory to follow the step by step instructions as stated in the T04 Ex installation manual...

Страница 21: ...nstallation module Axis P1275 from the power supply 2 Press and hold the control button and at the same time connect the system to the voltage supply PoE 3 Hold the control button pressed for about 30...

Страница 22: ...ket must be used in undamaged condition according to the flange hole pattern and placed between the flange and the hull The lateral position of the flat sur face contact surface is arbitrary If when c...

Страница 23: ...similarfat solventsand re grease it with OKS 403 or Molykote P 40 Carefully and evenly put the housing cover with its external thread onto the inter nal thread of the housing body Plug the recommende...

Страница 24: ...ase the applicable settings have to be carried out inside the menu System Options Advanced Plain Config User root Password root 7 1 Browser Support A list of the currently supported web browsers opera...

Страница 25: ...in po tentially explosive atmospheres must be adhered to The required maintenance intervals are specific to the individual devices The operating company has to determine these intervals depending on t...

Страница 26: ...wings 3D models certificates and other information are available in the download area of the product page on our website https www samcon eu en products network excam ipp1275 If you wish additional te...

Страница 27: ...Doc ID 200917 PT08BA ES ExCam IPP1275_en_rev 00 docx Page 27 of 28 12 Notes...

Страница 28: ...Schillerstrasse 17 35102 Lohra Altenvers Germany www samcon eu info samcon eu Phone 49 6426 9231 0 fax 31...

Отзывы: