![Salicru EQUINOX EQX2 3001-HSX Скачать руководство пользователя страница 64](http://html1.mh-extra.com/html/salicru/equinox-eqx2-3001-hsx/equinox-eqx2-3001-hsx_user-manual_3633299064.webp)
64
SALICRU
When the installation's consumption is lower than the previ-
ously-defined
P
MAX
parameter, the consumption loads are first
supplied from the solar panel power and the shortfall comes
from the grid, while the battery is charged from the grid sur-
pluses (these surpluses are the grid power that is missing until
the
P
MAX
value is reached) and from the solar panel surpluses,
if there are any.
2.
Scenario 2:
Consumption of the installation higher than
P
MAX
,
but solar panel power higher than the consumption peak.
Fig. 14. "PeakLoad2" function diagram
Prioritisation
Battery charge
Supplying the loads
Grid (= P
MAX
)
-
2
PV surpluses
1
-
PV
-
1
Fig. 15. Work priorities in "PeakLoad2".
In this case, the installation's consumption is higher than
P
MAX
,
resulting in an over-peak consumption, but this over-peak
is resolved with the solar panel power. Their surpluses are
directed to the battery charge.
3.
Scenario 2.1
: Consumption of the installation higher than
P
MAX
and over-peak consumption higher than solar panel
power.
Fig. 16. "PeakLoad2.1" function diagram
Prioritisation
Battery charge
Supplying the loads
Grid (= P
MAX
)
-
2
Battery
-
3
PV
-
1
Fig. 17. Work priorities in "PeakLoad2.1".
When the consumption power is higher than
P
MAX
and also
the over-peak consumption is unattainable with the solar panel
power, the battery power is used to supply the missing con-
sumption.
To better illustrate all the scenarios described in the "Peak-
load" operation, the following graph has been created that
simulates the energy flows in a photovoltaic installation with
battery for one day:
Scenario 1
Consumption
PV generation
Battery
SOC
Power (kW)
Scenario 1
Time (h)
Pmax
100%
30%
Scenario 2 Scenario 2.1
Fig. 18. Simulation of energy flows per day.
Red shows the installation's consumption, green the power
generated from solar panels, yellow the battery's state of
charge and blue the battery power (negative power indicates
that the battery is charging and positive power indicates that
it is discharging). The red line indicates the established power
limit contracted from the grid (
P
MAX
). In Fig. 18, the three sce-
narios described above can be seen clearly.
Содержание EQUINOX EQX2 3001-HSX
Страница 2: ...2 SALICRU...
Страница 51: ...51 ES EQX2 INVERSORES SOLARES DE CONEXI N A RED MANUAL DE USUARIO...
Страница 54: ...54 SALICRU...
Страница 103: ...103 EN EQX2 SOLAR INVERTERS CONNECTED TO THE GRID USER MANUAL...