
7
Commissioning
Before you finish
• Check the pump inlet filter is fitted
• With the HomeBoost
™
installed, flush the
inlet pipe work and carefully fill the pump
with water by opening all the water outlets
BEFORE electrically switching the pump on.
It is CRITICAL to discharge water
through the pump through;
1. all the cold outlets on a whole
house application.
or
2. all the hot outlets for a combi boiler
boost application.
Using natural flow before switching
the pump on electrically. This
will ensure that the air has been
discharged from the connecting
pipe work and pump chamber.
The best method is:
1 Connect pump pipe work
2 Check that all isolating valves are open
3 Turn mains water on at the stop tap
4 Ensure all air is purged from the system
5 Check for natural flow on the cold
outlets (or hot outlets for a combi boost
installation)
6 Inspect connecting pipe work for leaks
7 Plug in electrical supply to pump
8 Turn mains electrical supply on
9 Green pump lights in the logo label
should be lit and steady.
This indicates
that the power is on and that the pump
is ready for use
10 Turn a cold outlet on (or hot outlet for a
combi boost application)
11 HomeBoost
™
should activate and the
green lights should rotate, indicating that
the pump is in operation.
If the HomeBoost
™
does not activate,
please refer to the trouble shooting
section of these application notes.
!
!
x142741_SP_p2_lh.indd 8
16/12/2014 15:11
Содержание HomeBoost
Страница 14: ...13 Notes x142741_SP_p2_lh indd 14 16 12 2014 15 11...
Страница 15: ...x142741_SP_p2_lh indd 15 16 12 2014 15 11...