
Suntrio Plus Series
- 27 -
Objec
t
Description
A
Communication light: blue light flashing = receiving data
yellow light flashes = sending data
B
Status indicator lamp: Red LED light = Fault; Green LED light = operation;
when red and green light are all off, the inverter is in initializing state or
countdown for grid-tie.
C
Power indicator light: yellow light: the power system of inverter is operating
normally
D
◀
Moves the cursor or the focus point to the left
E
▶
Moves the cursor or the focus point to the right
F
Starts the menu / button to confirm selection
G
▲
Moves the cursor up or increases the setting value
H▼
Moves the cursor down or reduces the setting value
The inverter provides five buttons for inquiry of operational information and
parameters, these five buttons can be used repeatedly.
6.2 First Run Setup
6.2.1 Set the Country
When the solar inverter begins to run for the first time, please configure the
time of usage, and the inverter LCD will display as below:
Power
0 W
E-Today
0.00 kWh
T-Today
0.0 h
T-Total
0.0 h
15-06-09 15
:
47
Graph
Setting
Run-Info
About
E-Total
0.00 kWh
Set system Time
Init
Time
:
Date
:
09/23/2015
Return
Please Set Time & Date
13:23:56
Ok
Figure 6.2 Set the time
Users can press Up, Down, Left, Right and ENT buttons to set local time and
confirm the selection.Then the inverter will display the interface for country
selection as shown in Figure 6.3: