Suntrio Plus Series
- 0 -
User Manual
SAJ Solar Inverter
www.saj -electric.com
Страница 1: ...Suntrio Plus Series 0 User Manual SAJ Solar Inverter Suntrio Plus Series www saj electric com...
Страница 2: ...ting and safety Please follow the instructions of this manual so that we can ensure delivery of our professional guidance and wholehearted service Customer orientation is forever our commitment We hop...
Страница 3: ...nd Dimensions of products 10 3 4 Datasheet 11 Chapter 4 Instructions for installation 13 4 1 Safety Instructions 13 4 2 Pre installation Check 13 4 3 The Determination of the Installation Method and P...
Страница 4: ...omputer Interface 26 6 2 First Run Setup 27 6 3 Monitoring Operation 41 Chapter 7 Fault Code and Troubleshooting 42 Chapter 8 Recycling and Disposal 45 Chapter 9 Guarantee Service 46 Chapter 10 Contac...
Страница 5: ...K Please keep this manual all time available in case of emergency 1 2 Safety Instructions DANGER DANGER indicates a hazardous situation which if not avoided will result in death or serious injury WARN...
Страница 6: ...3 Target Group Only qualified electricians who have read and fully understood all safety regulations contained in this manual can install maintain and repair the inverter Operators must be aware of t...
Страница 7: ...es to let the energy storage capacitors fully discharged after disconnecting from power source WARNING The installation service recycling and disposal of the inverters must be performed by qualified p...
Страница 8: ...k of damage due to improper modifications NOTICE Public utility only The PV inverter is designed to feed AC power directly to the public utility power grid do not connect AC output of the inverter to...
Страница 9: ...ion Do not touch metal plate housing during operating An error has occurred Please go to Chapter 9 Troubleshooting to remedy the error This device SHALL NOT be disposed of as residential waste Please...
Страница 10: ...cordance with the requirements of public grid and send the AC power into grid Table 3 1 shows the structural diagram of the typical application system of Suntrio Plus inverter Name Description Remarks...
Страница 11: ...XK Suntrio Plus represents for product name XK represents rated power of inverter for example 5K means 5kW 3 3 Overview and Dimensions of products The dimensions of Sununo Plus series products is sho...
Страница 12: ...MPPT 2 Number of DC Connection Sets per MPPT 1 1 2 1 DC Switch Integrated Output AC Rated AC Power W 230V 50Hz 4000 5000 6000 8000 10000 Max AC Power VA 4000 5000 6000 8000 10000 Rated AC Current A 5...
Страница 13: ...ic LCD Display Backlight Inverter Parameter and Data Display Display Language English Communication port 1 RS485 1 RS232 Communication WiFi GPRS Ethernet Optional General Data Topology Transformerless...
Страница 14: ...on must be performed by qualified personnel only in compliance with national and local standards and regulations NOTICE This equipment is suitable for the pollution degree II Inappropriate or the unha...
Страница 15: ...tural convection cooling and it can be installed indoor or outdoor Please install the equipment under the guidance of Figure 4 1 Vertical installation on floor level is recommended Mount vertically or...
Страница 16: ...cations with sufficient air exchange Ensure additional ventilation if necessary To make sure the installation spot is suitably ventilated if multiple SAJ grid tied solar inverters are installed in the...
Страница 17: ...oles can be determined by using rear panel See Figure 4 3 below Figure 4 3 Dimensions of rear panel 4 4 2 Drill Holes and Place the Expansion Tubes Follow the given guides drill 3 holes in the wall in...
Страница 18: ...e mounted in the mounting position by screws as shown in Figure 4 5 Figure 4 5 Mount the rear panel 4 4 4 Mount the Inverter Carefully mount the inverter to the rear panel Make sure that the rear part...
Страница 19: ...icity shock When power on the equipment should be in conformity with national rules and regulations The direct connection between the converter and high voltage power systems must be operated by quali...
Страница 20: ...Name A DC Input B DC Switch C RS232 Wi Fi Port D RS485 Port E AC Quick connect Terminal Table 5 1 Specifications for interface 5 3 AC Side Connection Cross sectional Area of Cables mm Outside Diamete...
Страница 21: ...through the AC Waterproof hole Figure 5 2 Feed the cables 5 3 2 Connect the cables according to connection marks of L1 L2 L3 N and PE Figure 5 3 Connect the cables 5 3 3 Secure all Parts of the AC Co...
Страница 22: ...5 5 Connect the inverter 5 4 DC Side Connection Cross sectional Area of Cables mm Outside Diameter of the Cables mm Scope Recommended Value 4 0 6 0 4 0 4 2 5 3 Table5 3 Recommended Specifications of D...
Страница 23: ...ositive connector to the positive side of the solar panels and connect the negative connector to the negative side of the solar side Be sure to connect them in right position Connecting Procedures 1 T...
Страница 24: ...t insulated enclosure a click should be heard or felt when the contact cable assembly is seated correctly 6 Fasten the lock screws on positive and negative connectors into respondent insulated enclosu...
Страница 25: ...ct the real time external current leakage When a leakage current detected exceeds the limitation the inverter will be disconnected from grid quickly if an external leakage current device is connected...
Страница 26: ...module RS232 can externally connect with Ethernet module For more details please refer to the operating manual of Ethernet module RS232 can externally connect with GPRS module For more details please...
Страница 27: ...Ports connector Number of connector Color of cable 1 B 2 A 3 Metal shielded wire Table 5 6 RS485 assembly sequence of RS485 Chapter 6 Debugging Instructions 6 1 Introduction of Human Computer Interfac...
Страница 28: ...etting value H Moves the cursor down or reduces the setting value The inverter provides five buttons for inquiry of operational information and parameters these five buttons can be used repeatedly 6 2...
Страница 29: ...to run for its first time otherwise the inverter will not operate correctly If users can not locate the corresponding country please abort the setting and contact the after sales for confirmation 6 2...
Страница 30: ...System Parameter Power 1230W E Today 11 33 kWh T Today 1 7 h T Total 4 6 h 15 07 09 15 47 Graph Setting Run Info About 0 1 2 2 4 3 6 4 8 6 0 7 2 8 4 9 6 kW 10 8 3 5 7 9 11 13 15 17 19 21h E Total 14...
Страница 31: ...33 kWh Normal Language Time Grid Compliance Clear Errors Clear Energy LCD Setting Factory Reset Change Password Exit Communicate Set Power 0 W E Today 0 00 kWh T Today 0 0 h T Total 0 0 h 15 06 09 15...
Страница 32: ...rs Clear Energy LCD Setting Factory Reset Change Password Exit Grid Compliance Power 1230W E Today 11 33 kWh T Today 1 7 h T Total 4 6 h 15 07 09 15 47 Graph Setting Run Info About E Total 14 35 kWh E...
Страница 33: ...5 47 Graph Setting Run Info About 0 1 2 2 4 3 6 4 8 6 0 7 2 8 4 9 6 kW 10 8 3 5 7 9 11 13 15 17 19 21h E Total 14 35 kWh E Today 11 33 kWh Normal Communicate Set Language Time Grid Compliance Clear Er...
Страница 34: ...1 7 h T Total 4 6 h 15 07 09 15 47 Graph Setting Run Info About 0 1 2 2 4 3 6 4 8 6 0 7 2 8 4 9 6 kW 10 8 3 5 7 9 11 13 15 17 19 21h E Total 14 35 kWh E Today 11 33 kWh Normal Communicate Set Languag...
Страница 35: ...1 2 2 4 3 6 4 8 6 0 7 2 8 4 9 6 kW 10 8 3 5 7 9 11 13 15 17 19 21h E Total 14 35 kWh E Today 11 33 kWh Normal Communicate Set Language Time Grid Compliance Clear Error Clear Energy LCD Setting Factory...
Страница 36: ...type series number machine code software version of display panel mainframe version of the control panel and the settings of country 6 2 6 Self test of the Inverter LCD Display Operation Steps Self te...
Страница 37: ...7 h T Total 4 6 h 18 11 09 15 47 Graph Setting Run Info About E Total 14 35 kWh E Today 11 33 kWh Normal Return Ovp 59 S2 test Ovp10 59 S1 test Uvp 27 S1 test Uvp2 27 S2 test Ofp 81 S1 test Ofp2 81 S...
Страница 38: ...wer 1230W E Today 11 33 kWh T Today 1 7 h T Total 4 6 h 18 11 09 15 47 Graph Setting Run Info About E Total 14 35 kWh E Today 11 33 kWh Normal Vt 264 5V Vs 221 8V Vo 221 3V It 200 ms To 188 ms 18 11 0...
Страница 39: ...g Run Info About E Total 14 35 kWh E Today 11 33 kWh Normal Return Ovp 59 S2 test Ovp10 59 S1 test Uvp 27 S1 test Uvp2 27 S2 test Ofp 81 S1 test Ofp2 81 S2 test Ufp 81 S1 test Ufp2 81 S2 test ALL test...
Страница 40: ...Today 1 7 h T Total 4 6 h 18 11 09 15 47 Graph Setting Run Info About E Total 14 35 kWh E Today 11 33 kWh Normal No Result Ovp 59 S2 test Next Return 2 If any item fails the test results will be as be...
Страница 41: ...trio Plus Series 40 Power 1230W E Today 11 33 kWh T Today 1 7 h T Total 4 6 h 18 11 09 15 47 Graph Setting Run Info About E Total 14 35 kWh E Today 11 33 kWh Normal Test failed Ovp 59 S2 test Next Ret...
Страница 42: ...emotely The equipment can be connected to local internet via Ethernet module and the Wi Fi web server which is embedded in the machine following this the operational status of the inverter can be moni...
Страница 43: ...tes High Master 18 20 22 L1 L2 L3 Frequency High Master 19 21 23 L1 L2 L3 Frequency Low Master 24 25 26 L1 L2 L3 Grid Lost Error Master 27 GFCI Error Master 28 29 30 L1 L2 L3 DCI Error Master 31 Insul...
Страница 44: ...r Check whether the radiator is blocked whether the inverter is in too high or too low temperature if the above mentioned are in normal please contact your distributor or phone SAJ GFCI Device Error I...
Страница 45: ...check whether the inverter is in wet environment check whether the grounding of the inverter is loose or not If the above mentioned are in normal please contact your distributor or phone SAJ Current...
Страница 46: ...d Disposal This device should not be disposed as residential waste An Inverter that has reached the end of its life and is not required is to be returned to your dealer or you must find an approved co...
Страница 47: ...Suntrio Plus Series 46 Chapter 9 Guarantee Service Please refer to the warranty card...
Страница 48: ...City Guangdong P R China Postcode 510663 Web http www saj electric com Technical Support Service Tel 86 20 6660 8588 Fax 86 20 6660 8589 E mail service saj electric com International Sales Tel 86 20 6...
Страница 49: ...e of settlement or 30 months from the date of shipment from SAJ by providing the serial number of the unit and purchased receipt whichever is shorter You can purchase the warranty extension for 10 yea...
Страница 50: ...fect 5 Detailed information about the entire system modules circuits etc 6 Documentation of previous claims exchanges if applicable After receiving above information SAJ will decide how to proceed the...
Страница 51: ...ce fee Parts On site attendance fee Cost of travel and time for the technician in attending on site Parts Cost of replacement parts including any shipping admin fee that may apply Labor Labor time fee...
Страница 52: ...by the Dealer or the end user Transport damage including scratch caused by movement inside packaging during shipping A Claim should be made directly to shipping company insurance Company as soon as th...
Страница 53: ...claim please complete the below forms and send this page to SAJ attached with the Customer s invoice For Customer to fill in Name City Country Zip Tel Fax E mail Information on Device Device type Seri...
Страница 54: ...Suntrio Plus Series 53 For Installer to fill in Modules Used Modules Per String No of String Installation Company Contractor License Number Company City Country Zip Tel Fax E mail Signature Date...
Страница 55: ...zhou High tech Zone Guangdong P R China Zip 510663 Tel 86 20 6660 8588 Fax 020 6660 8589 Web http www saj electric com Edition No V0 0 Due to the continuous improvement of products technical parameter...