H1 Series
- 31 -
5.7.3 Open the waterproof cover, pass the prepared communication
cable through each component, insert corresponding communication
port, then tighten the screws.
Figure 5.14 Connection of communication cable
5.7.4 Smart Meter Connection
Notice: The hybrid inverter is with export limitation function, which can be
realized by connecting SAJ recommended smart meter to the hybrid
energy storage system. Users can contact SAJ for further details for the
smart meters. If users have no intention to set the export limitation
function, please ignore chapter 5.7.4.
If users have purchased the smart meter that recommended by SAJ,
before setting the export limitation function, users shall connect the meter
to the system with procedures below:
(1) Power cable connection: Connect Live to terminal 1 of the Meter to
enter and exit from terminal 3. Connect Neutral to terminal 2 of the Meter
to enter and exit from terminal 4.
(2) Connect meter to Hybrid Inverter: Wire "RS485-
A+” of inverter to
terminal 24 of the Meter, then wire "RS485-B-
” of inverter to terminal 25 of
the Meter.
Содержание H1 Series
Страница 1: ...H1 Series 0...
Страница 35: ...H1 Series 34 5 8 Connection Diagram Figure 5 18 H1 Connection diagram...
Страница 68: ...H1 Series 67...