Pre-installation checklist
Installation instructions
The installation instructions are divided into three segments -
The Pre-Installation Checklist, The Initial Installation Procedure,
and the Final Installation Procedure. Each segment lists the
procedures you will perform, followed by the detailed instructions
for each procedure.
Pre-Installation Checklist
1. Installation should be performed by a trained and qualified
installer. Make sure to adhere to all applicable local building
codes. A National Electric Code (NEC) Class 2 power supply
must be used for the MorphoAccess.
2. Prepare for the MorphoAccess installation by selecting a
mounting location that reduces exposure to the environment
as much as possible within easy reach of the door that is
being controlled by the MorphoAccess.
3. Verify that a standard junction box, at least the size of a
dual-gang box, has been installed at the correct height
necessary for the MorphoAccess to meet any local or Federal
requirements for ADA compliance.
4. Verify that there is enough free wall space surrounding
the junction box to accommodate the placement of the
MorphoAccess.
5. Verify that the main power and functional interface cables are
properly wired within the building, per applicable local building
codes, and that wire stubs are accessible within the junction
box where the MorphoAccess will be installed.
6. Turn off the main power to the junction box until the installation
of the MorphoAccess is complete.
Note:
Once steps 1 through 6 are complete, the
MorphoAccess is ready for installation.
Содержание MorphoAccess 200E
Страница 1: ......
Страница 2: ......
Страница 4: ...ii ...
Страница 9: ...5 General description Rear View Wiegand RS 485 Power Ethernet Multi function Wall Gasket Location ...
Страница 29: ...25 Appendix 1 Rear View Location of Cables Multi function Ethernet Power Wiegand RS485 ...
Страница 34: ......
Страница 35: ......
Страница 44: ......
Страница 45: ......
Страница 47: ......
Страница 111: ......
Страница 112: ......