background image

 

 

Return to Table of Contents

 

Ref: FrogLine_Tuff_Post_Concrete_Handbook 

Page 18 of 20 

 

Doc ID: MKT-593      Version: 7.0    

 

EXAMPLE: HORIZONTAL LIFELINE ON PITCHES BELOW 25 DEGREES 

 

All  working  at  heights  safety  procedures  must  be  complied  with  when installing  SafetyLink  Height  Safety  Systems.  For 
more  information  refer  to  your  state  or  territories  current  legislation,  regulations,  policies  and  codes  of  practices. 
Horizontal height safety lifelines must only be installed and used by competent people with relevant current height safety 
qualifications. 

 
 

 

SAFETYLINK  HEIGHT  SAFETY  SYSTEMS  MUST  ONLY  BE  INSTALLED  AS  PER  OUR  INSTALLATION  GUIDES,  TO 
STRUCTURES  AS  SPECIFIED  IN  THE  INSTALLATION  MANUAL  FOR  EACH  PRODUCT.    SHOULD  ANY  DOUBT  EXIST  IN 
REGARD TO THE STRUCTURES INTEGRITY AN ENGINEER SHOULD BE CONSULTED. 
 

 

FrogLine 

 Intermediate Unit 

FrogLine End Unit and  

Tensioner with Tension indicator

 

FrogLine  
Corner Unit 

FrogLine Intermediate Unit

 

C

abl

e

 

MAXIMUM SPACE BETWEEN 
INTERMEDIATE ASSEMBLY IS 

 TEN (10) METRES 

FrogLine End Unit and Termination

 

Th

is

 is 

gu

id

on

ly

 

FrogLine Intermediate Unit

 

Содержание Classic Tuff-Post Concrete Lifeline

Страница 1: ...SafetyLink s installation handbook using only products supplied by SafetyLink Pty Ltd Failure to follow all warnings and instructions may result in serious injury or death Asia Pacific The Americas 61...

Страница 2: ...OST 11 LIFELINE SYSTEM INFORMATION 12 INSTALLATION CABLE TENSIONERS TERMINATION FITTINGS 12 TIGHTENING ASSEMBLY TORQUE SETTINGS FOR SWAGELESS TERMINALS 12 APPENDIX A SWAGELESS SWAGED FITTINGS INSTALLA...

Страница 3: ...ponents use nickel anti seize or similar boundary layer lubricant Recommended waterproofing for roof tiles Sika Flex Co Polymer Sealant Recommended waterproofing for metal roof Silicone Sealant Neutra...

Страница 4: ...check the 16mm bolt securing the FrogLine Base to the Tuff Post for rigidity and tightness If the Bolt can turn in the anticlockwise direction it will require attention Visually inspect the attachment...

Страница 5: ...on by replacement for a period of 1 one year from the date of shipment This limited warranty applies provided that a defects have arisen solely from faulty materials or workmanship b the Products have...

Страница 6: ...316 SS 1 TUFF POST300 TUFF POST 300mm 316 SS 1 CON M12x160 Anchor Rod M12X160 M12 Nut M12 Spring Washer M12 Washer 316 SS 4 TUFF POST INTERMEDIATE EXT ANCHOR PRODUCT CODE STAT FROGTUFF008C 300 PRODUC...

Страница 7: ...316 SS 1 TUFF POST600 TUFF POST 600mm 316 SS 1 CON M16x160 Anchor Rod M16x160 M12 Nut M12 Spring Washer M12 Washer 316 SS 4 TUFF POST INTERMEDIATE EXT ANCHOR PRODUCT CODE STAT FROGTUFF008C 600 PRODUC...

Страница 8: ...0mm Minimum concrete grade MPA32 Minimum anchor rod embedment 115mm Recommended chemical anchor Fischer FIS V as per Fischer Product Supplement Data sheets If any doubt exists with the strength of the...

Страница 9: ...sts is embedded in the concrete and chemical adhesive gel Remove any chemical adhesive gel that has been displaced from the anchor hole during installation Allow chemical adhesive gel to cure to full...

Страница 10: ...ssment STEP 3 Mark drill bit or set drill depth to 120mm this enables easy detection of correct length STEP 4 Drill a 14mm or 18mm hole into the concrete minimum 115mm embedment into structure concret...

Страница 11: ...TINGS Note It is always recommended to install at least one intermediate in overhead lifeline system when SRL s are used FITTING THE HEIGHT SAFETY SYSTEM TO THE TUFF POST FOLLOW BELOW STEPS FOR END IN...

Страница 12: ...manual maximum distance between End Intermediate and Corner Anchors is 10 metres 4 Connect Swaged Swageless Tensioner with Tension Indicator to FrogLine End Anchor top connection point Do not attach T...

Страница 13: ...ace between the jaws 3 Place the brass pressure ring on the end of the cable Make sure that the distance from the pressure ring to the end of the cable is 5 8mm 4 Slide the jaw housing over the jaws 5...

Страница 14: ...1x19 7x19 and 7x7 cable The measurement should be taken with Vernier Callipers to ensure accuracy If your measurements are outside the acceptable tolerance range this can be a sign of either a loss of...

Страница 15: ...own below image Load anchorage point to 7 5kN refer pull test device instructions Ensure energy absorbing regions of the anchor system are not loaded during this test Check concrete and chemical adhes...

Страница 16: ...ption MAKE SURE YOU ARE SAFE AT ALL TIMES WHILST ATTACHING OR DETACHING FROM THE FROGLINE LIFELINE SYSTEM A FALL RESCUE PLAN SHOULD BE DEVELOPED PRIOR TO USING SAFETYLINK EQUIPMENT ENSURE YOU USE THE...

Страница 17: ...300 01 Injection Mortar FIS V Cartridge 300ml 1 CON CHEM FISMR Static Mixer FIS MR 2 FIS V 300T INJECTION MORTAR APPLICATION ANCHOR DIAMETER mm DRILL HOLE DIAMETER mm DRILL HOLE DEPTH mm MORTAR FIXING...

Страница 18: ...must only be installed and used by competent people with relevant current height safety qualifications SAFETYLINK HEIGHT SAFETY SYSTEMS MUST ONLY BE INSTALLED AS PER OUR INSTALLATION GUIDES TO STRUCTU...

Страница 19: ...owing complete access to your roof Detailed comprehensive documentation provided e g installation guides testing results product sheets should be provided SafetyLink can also provide you with a qualif...

Страница 20: ...FALL OR SHOWS A DEFECT Any piece of equipment including both personal and permanently installed items which has been used to arrest a fall or which shows any defect during operator or periodic inspect...

Отзывы: