TUFF-POST (Square)
–
Concrete Installation
LIFELINE CABLE
Following cables can be used for SafetyLink lifeline systems,
•
Cable (STAT.CABLE001): 8mm dia, 7x7 wire rope
•
Cable (STAT.CABLE_8MM_7X19_SS): 8mm dia, 7x19 wire rope. It provides high flexibility and suited for
lifelines with short intermediate intervals and multiple corners.
•
Cable (STAT.CABLE_8MM_1X19_SS): 8mm dia, 1x19 wire rope. It provides limited flexibility for overhead
lifeline and suited for easy transitions over intermediates with SRL’s.
DO NOT USE WITH SWAGELESS FITTINGS.
Note: It is always recommended to install at least one intermediate in overhead lifeline system when SRL’s are used.
FITTING THE HEIGHT SAFETY SYSTEM TO THE TUFF-POST
FOLLOW BELOW STEPS FOR END, INTERMEDIATE AND CORNER UNITS
STEP 1
Once TUFF-POST is installed as per previous page
instructions.
Place FrogLine Base on top of the installed TUFF-
POST.
Then place M16 Bolt through M16 Spring Washer,
then DonutLink, into TUFF-POST.
STEP 2
Tighten the fasteners making certain the FrogLine
Base Unit lines up with the direction of the lifeline.
Note: Drilled-in anchorages such as friction and glued-in anchorages shall be placed so that the shear load
is at least twice the tension load. For FrogLine ConcreteLink components this translates to a pull at an
angle not exceeding 20 degrees to the surface in which the bolt is installed.