©
05/2019
Saferoad RRS GmbH, Please note that forwarding this drawing without permission from Saferoad RSS GmbH is a break of copyright.
1. Assemble beams
2. Align the transition
3. Tighten all screws with torque wrench
1. SP-Holme montieren
2. Übergangskonstruktion ausrichten
3. Alle Schrauben mit Drehmomentschlüssel festziehen
002.00
012.90/1
064.61
002.00
063.60
040.04
010.00
040.30
040.00
040.30
002.00
002.00
064.60
063.61
002.00
012.15 (B+D)
012.16 (A+C)
Montagetafel ·
Assembly drawing
F
1
Step 07
I
MegaRail s - BSWO Step 90
21/24