Table 26: Torque requirements
SAB 355 E
SGC 3519
M24 x 3.0
400
M30 x 3.5
678
SAB 355 X
SGC 3524
M24 x 3.0
400
M30 x 3.5
678
Note:
Based on:
1. Gaskets-Garlock® Blue-Gard® 3300 or KLINGERSIL C-4430
2. Bolts-class 8.8 or stronger hex head bolts, lightly oiled and clean
Monitoring of operation
To ensure satisfactory operation, it is required that you enter certain routines in a logbook on
a regular basis. You can use the items listed in the
Start-up log
, which is page 2 of the
Checklist
. The service engineer needs this information in connection with, for
example, error reports.
In addition to the items listed in the start-up log, you must enter all other activities of service,
maintenance, or repair work into your logbook, as required by
EN 378
and national laws.
Checklist
Along with this Operating manual we have provided a
Checklist
which serves
as a help to the service engineer and
must be filled in during commissioning and start-up
.
Keep the filled-in checklist, and send a copy to SABROE Factory as documentation that the unit
has been installed and commissioned correctly. The checklist will be required in case of a warranty
issue.
Important:
You must complete the following checklist during commissioning and start-up.