background image

7

Connect 120VAC power INPUT wiring to the unit’s 3-wire cage clamp. 

1.  Place the unit on the opti onal PT-BASE or the existi ng base from the previous illuminator. Pull the supply 

cable unti l it extends beyond the end of the conduit in the base from 6 to 8ʺ. Att ach the PT-6002 to the 

base with 2 of the supplied screws.

2.  Strip the jacket back 4ʺ back from the end of the internal wires.
3.  Strip the insulati on on each wire (black, white, and green) to 3/8ʺ +/- 1/16ʺ.
4.  Feed the cable and stripped wires through the white nylon fi nger grommet and dress it approximately as 

shown.

5.  Connecti ons (GFCI protected power must be provided to the unit):  

a.  The black (hot) wire connects to the terminal block orange segment, 

b.  the white wire (common) to the grey segment, and 

c.  the green wire (ground) to the yellow-green segment.

6.  Connect each wire to its correct segment (

Figure B

):

a.  Fully insert the wire installati on tool (supplied) into the segment’s smaller square hole.

b.  Firmly lever the tool to the left  to open the wire entry and hold it in place.

c.  Fully insert the correct (matching) wire into the segment’s larger square hole.

d.  Release the installati on tool and remove it.

e.  Pull the inserted wire fi rmly to confi rm that it is ti ghtly gripped.  

7.  Aft er all three wires are inserted, dress them so they do not interfere with each other, as shown in 

Figure C.

8.  Dress the cable to remove any excessive loops and/or kinks.

Att enti on – Do Not Lose the provided Installati on Tool, it is required for removal of the input wires should 

service or replacement be required.

FIGURE B (Steps 6a-6e): Installati on tool use – Insert fully, lever towards 

the left , insert wire, release tension by moving tool to the right, remove 

tool, & pull test wire

FIGURE C (Steps 7 & 8): Cage clamp shown with 120VAC 

input wires in place (connected and dressed, right side)

Содержание Power Tower PT-6002

Страница 1: ...stallation Instructions Read all instructions before attempting to perform installation work FOR USE WITH POOL AND SPA PRODUCTS 79 15280 01 Rev A0 4008814 ETL LISTED Conforms to UL STD 379 Certified t...

Страница 2: ...2...

Страница 3: ...ORMATION 4 FCC WARNING 4 SPECIFICATIONS 5 INSTALLATION GUIDELINES 6 STAND ALONE ENVIRONMENT OPERATION 9 INSTALLING THE PT 6002 UNIT TO THE PT BASE 9 ELECTRICAL PROTECTION MEASURES 10 WIRELESS REMOTE O...

Страница 4: ...n to operate the PT 6002 unsupervised F C C W A R N I N G 1 This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 this device may not cause harmful...

Страница 5: ...nt Temp 40 C 10 40 Maximum Soil Height Do NOT allow fill to exceed this level Optional PT BASE for new installations or when previous 2000 6000 Series illuminator base is not available CAUTION THE EQU...

Страница 6: ...h with the port but extend no more than 1 above it b 12VAC output conduit Cables from the lights must all come through the larger of the two ports in the PT Base as pictured in Figure A This conduit s...

Страница 7: ...6 Connect each wire to its correct segment Figure B a Fully insert the wire installation tool supplied into the segment s smaller square hole b Firmly lever the tool to the left to open the wire entry...

Страница 8: ...ad through the outermost hole and the red insulated lead through the innermost hole as shown 6 While holding both leads fully inserted flip both levers all the way up 7 Pull on each lead firmly to con...

Страница 9: ...on Remote On Off Operation Move the power switch to the lower remote position and use the hand held remote to toggle the low voltage power circuit on and off See below for remote button functions and...

Страница 10: ...nce normal operating temperatures return the unit will reset and operation will continue 2 Replaceable Current Fuse To protect against hazardous electrical conditions the PT 6002 utilizes a current fu...

Страница 11: ...Turn On Using the Wireless Remote Operation Zone 2 Push the button marked 2 ON OFF COLOR CHANGE to toggle on and off the power of Zone 2 on the PT 6002 Color Changing Operation To change LED pool ligh...

Страница 12: ...teps as outlined below 1 Shut off power at the appropriate circuit breaker remove all chances of accidental electrical shock 2 Remove lift off cover to allow access inside the PT 6002 3 Find the 5cm a...

Отзывы: