15
ON-DECK MOUNTING INSTRUCTIONS
1.
Place the assembled slide on the deck relative to the pool wall. Ensure that the exit flume clears
any coping. Slide may be angled slightly providing all dimensions are maintained as noted in the
Manufacturer’s Placement Instructions
noted in the following section.
2.
With the slide in its proper location, center punch or otherwise mark through
the (8) mounting holes at the bottom of the ladder and pedestal so that a
visible mark is apparent on the concrete.
3.
Move the assembled slide aside to facilitate drilling of the anchoring holes.
4.
Using a power drill and a 1/2” (13 mm) concrete drill bit, drill the holes to a
depth of 4” (0.102 M). Use tape or a marking on the drill bit to ensure that the
hole for the anchor is drilled to the required depth. Maintain drill hole straight
and perpendicular for proper holding strength of anchor stud.
5.
Clear the holes of all debris. Assemble anchor with nut and washer so that the
top of the nut is flush with the top of the anchor.
Move the slide over the
holes before inserting the anchors.
Drive anchor through the slide
mounting holes so that nut and washer are flush with the surface material.
6.
Expand anchor by tightening nut 3 to 5 turns. Once anchor is set remove nut
and install a lock washer, item #
(3),
and retighten nut to a torque of 25 ft.-lbs
(33.9 N-m).
Содержание heliX2
Страница 19: ...A APPENDIX A...
Страница 20: ...B APPENDIX B...