INSTALLATION MANUAL
EDGE DIVING SYSTEM
8
srsmith.com
When finishing the deck surface, maintain a level deck where the jig bolts project out so the dive stand makes uniform
contact with the deck surface. Allow the cement to fully cure before bolting the dive stand to the jig bolts.
Before bolting the dive stand to the jig bolts, chisel away any excess concrete that may have built up around the jig bolts
then remove the protective yellow rubber bolt caps.
The top surface of the diving board from the deck end to the
tip end shall be level or have an upward slope of 5/8” per foot
maximum. Elevation difference shall not exceed 3-3/4” for a 6’
board or 5” for a 8’ board. There shall be no downward slope
towards the water. The slope shall be measured using a level as
shown in the graphic to the left.
ONLY ONE PERSON ON THE JUMP BOARD AT A TIME, WITH A MAXIMUM WEIGHT OF 300 LBS.
FIG. D
Edge Springs
FIG. E
Edge Fiberglass Base
STEP ONE:
Lay the Edge board upside down on the box it was shipped in. Attach the Edge Springs to the board with hardware kit
EDGE-M. The long leg of the spring faces towards the pool as shown in Figure D. Use exploded view on page 9 for
reference. Hand tighten only at this point
.
STEP TWO:
Lay the base upside down on the springs and align the 3 holes in each spring center to the base. Orient Edge Base
to pool as
shown in Figure E. Use hardware kit EDGE-SP and bolt springs to base. Use exploded view on page 9 for reference. Tighten
the 6 bolts from base to springs at this time to 25-30 FT-LBS.
STEP THREE:
Turn the assembly over and tighten the board to spring hardware that was only hand tightened in step one. Tighten to 20-25
FT-LBS.
STEP FOUR:
Place the Edge stand over the four jig bolts and secure with hardware kit TS-BK. Tighten the Stand Anchor Hex Nuts to
40-45 FT- LBS. Do not over tighten.
The Diving Board must be installed according the below board leveling instructions:
HARDWARE NOTE:
Use a small dab of anti seize lubricant (included) on all bolt threads.
POOL WATER
POOL WATER