The EZ Hauler 3800 / 4100 series of machines are all
dielectrically tested to 46kv category “C” guidelines. This
qualification test is performed at the factory in
accordance with ANSI A10.31 guidelines.
It is important that periodic tests be performed to the EZ
Hauler just as any other digger-derrick in a companies
fleet.
Weight of load must be known at all times . Boom capacity
at any angle should never be exceeded. Please follow
the weight scale posted on each EZ Hauler for weight
capacity.
IMPORTANT!
Содержание EZ Hauler 4100
Страница 1: ...EZ Hauler 4100 Training Procedure Manual...
Страница 4: ...Hard hats and protective gear must be worn by all personnel when using the EZ Hauler 4100...
Страница 9: ...Pre trip Inspection Check all tires on the EZ Hauler 4100 trailer for wear proper inflation...
Страница 12: ...Pre trip Inspection Turn on the remote control check the function of all controls...
Страница 29: ...Auger Operation Procedure...
Страница 31: ...3 Release auger latch and slowly lower auger 4 IMPORTANT You must raise boom to lower auger assembly...
Страница 32: ...5 Carefully unwind dig auger and remove strap You are now ready to use the remote control to auger as needed...
Страница 41: ...Bucket Assembly Standard Operating Procedure...
Страница 45: ...Shows the bucket mount installed and pinned it in place...
Страница 46: ...The bucket can now be mounted to either side of the mount to best accommodate working from it...
Страница 49: ...Hydraulic Pole Guide Procedure...
Страница 50: ...1 Slide pole guide in to receiver of sheave head 2 Install and secure pin...