
Moving a Transformer
Always secure a transformer to
the machine with the straps
stored in the trailer toolbox. It
may be necessary to rotate the
boom slightly in order to carry a
transformer.
Drive the EZ Hauler 4100
slowly.
Make turns slowly and
carefully.
(Picture may not be a true representation of your machine.)
Содержание EZ Hauler 4100
Страница 1: ...EZ Hauler 4100 Training Procedure Manual...
Страница 4: ...Hard hats and protective gear must be worn by all personnel when using the EZ Hauler 4100...
Страница 9: ...Pre trip Inspection Check all tires on the EZ Hauler 4100 trailer for wear proper inflation...
Страница 12: ...Pre trip Inspection Turn on the remote control check the function of all controls...
Страница 29: ...Auger Operation Procedure...
Страница 31: ...3 Release auger latch and slowly lower auger 4 IMPORTANT You must raise boom to lower auger assembly...
Страница 32: ...5 Carefully unwind dig auger and remove strap You are now ready to use the remote control to auger as needed...
Страница 41: ...Bucket Assembly Standard Operating Procedure...
Страница 45: ...Shows the bucket mount installed and pinned it in place...
Страница 46: ...The bucket can now be mounted to either side of the mount to best accommodate working from it...
Страница 49: ...Hydraulic Pole Guide Procedure...
Страница 50: ...1 Slide pole guide in to receiver of sheave head 2 Install and secure pin...