5
The mounting and installa-
tion of the TC device in an
electrical distribution box
must be performed by a
qualified electrician.
Pay attention to actual
norms, in order to fulfill the
general safety requirements
for telecommunication sys-
tems and to avoid disturbing
interferences.
A physical separation or
suitable partition wall must
be provided (clearance or
shielding).
1 Connect the subscriber
line at the screw terminals
La and Lb (ring and tip) of
the device. Additional
telephone jacks can be
connected to terminal a2
and b2 (see page 6).
The device can also be
connected at an extension
of a telephone system.
The upper terminal block
has to be pulled out for
connection of the wires.
2 The terminals L1 and N
must be connected with
230-V-mains (see page 6).
The terminals can hold wires
up to max. 1 x 1.5 mm².
3 The wiring for the device
must carried out accord-
ing to the diagram on
page 6.
Putting into Operation
Installation