8 MC500-1ERV
INSTALLATION CHECK LIST
MiniCore Model #
Serial #
Owner
Owner Phone #
Owner Address
Installing Contractor
Start Up Mechanic
Inspect the unit for transit damage and report any damage on the carrier's freight bill.
Check model number to insure it matches the job requirements.
Install field accessories and unit adapter panels as required. Follow accessory and unit installation manuals.
Verify field wiring, including the wiring to any accessories.
Check all multi-tap transformers, to insure they are set to the proper incoming voltage.
Verify blower wheels are centered. Realign if needed.
Prior to energizing the unit, inspect all the electrical connections.
Power the unit. Bump the motor relay to check rotation. If blower motor fans are running backwards, de-
energize power to the unit, then swap reversing plug on motors to change direction. Re-check.
Perform all start up procedures outlined in the installation manual shipped with the unit.
Fill in the Start Up Information as outlined on the opposite side of this sheet.
Provide owner with information packet. Explain the thermostat and unit operation.
START UP INFORMATION SHEET
VOLTAGE - MCV UNIT
Incoming Voltage L1-L2
Running Voltage L1-L2
Secondary Voltage
AMPERAGE - MCV MOTORS
Intake Motor: Nominal HP Rated Amps
Running Amps
Exhaust Motor: Nominal HP
Rated Amps
Running Amps
Wheel Motor: Nominal HP
Rated Amps
Running Amps
AIRFLOW
Intake Design CFM
Pressure Drop
Calculated CFM
Exhaust Design CFM Pressure Drop
Calculated CFM
Amb. db Temp
Return Air db Temp*
Tempered Air db Temp*
Amb. wb Temp
Return Air wb Temp*
Tempered Air wbTemp*
* Measure after 15 minutes of run time