Airflow-IQ Start-up & Commissioning Guide

Power

1 .  Carefully remove the top of the Phoenix Contact

®

 screw terminal connector and insert the wires . Tighten the 

terminals and reconnect them to the controller board .

2 .  Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended) .
3 .  Connect the 24 VAC hot wire to the primary probe terminal labeled 24H .
4 .  Connect the 24 VAC common wire to the primary probe terminal labeled 24G .

Note: 

The two 24H connections are electrically identical, and the two 24G connections are also electrically identical .

Completing the Wiring

When the primary and ancillary probes, remote display and network wiring are complete, apply power to the system . 
The version number is displayed followed by the number of probes found and total sensors . Confirm this informa-
tion is correct for the air measurement system installed . If it is incorrect, check all probe network wiring and probe 
address dial settings .
Confirm that no two ancillary probes are set for the same address . Each probe address must be unique on the probe 
network to work correctly . The primary probe and remote display are hard-coded addresses and do not need to be 
changed or addressed . Confirm the connections are made to the probe network are not to the BACnet or analog 
output connections on the primary probe . After the device warms up, the temperature and flow readings display .
Refer to the TDP05K Advanced Thermal Dispersion Probe Air Flow Measuring System Technical Bulletin 

http://www .ruskin .com/catalog/servefile/id/6767 for detailed configuration instructions . 

TDP05K Advanced Thermal Dispersion Probe Airflow Measuring System Installation Instructions

13

Ruskin—CONFIDENTIAL

preliminary —this information may change

3. Connect the shield wire from the primary probe to the Sh terminal. The shield only connects on the output end.
Note: The Shield is connected on one end of each wire run and should never be connected on both ends of one wire.

Power

1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the

terminals and reconnect them to the controller board.

2. Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended).
3. Connect the 24 VAC hot wire to the primary probe terminal labeled 24H.
4. Connect the 24 VAC common wire to the primary probe terminal labeled 24G.
Note: The two 24H connections are electrically identical, and the two 24G connections are also electrically identical.
Ancillary Probe Wiring

Network

1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the

terminals and reconnect them to the controller board.

2. Connect the probe network terminal from the primary probe to the probe network in terminal on the ancillary

probe(s).
a. Connect the shield wire from the primary probe to the Sh Out terminal. The shield only connects on one

end.

b. Connect the 24 AWG black wire from the primary probe terminal labeled Network D- to the ancillary probe

terminal labeled Probe Network D-.

c. Connect the 24 AWG white wire from the primary probe terminal labeled Network D+ to the ancillary probe

terminal labeled Probe Network D+.

3. Connect additional probes in a daisy-chain series.

Note: The last probe in each air measurement station must have the end of line (EOL) switch set for the probe

network (switch 3 [see Figure 16]). If the primary probe output is connected to a BACnet network interface and 

the TDP05K Airflow Measuring System is the end of line in the BACnet network, set the BACnet switch to 1 ON 

(shown in the off position in Figure 16).

TDP05K Advanced Thermal Dispersion Probe Airflow Measuring System Installation Instructions

13

Ruskin—CONFIDENTIAL

preliminary —this information may change

3. Connect the shield wire from the primary probe to the Sh terminal. The shield only connects on the output end.
Note: The Shield is connected on one end of each wire run and should never be connected on both ends of one wire.

Power

1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the

terminals and reconnect them to the controller board.

2. Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended).
3. Connect the 24 VAC hot wire to the primary probe terminal labeled 24H.
4. Connect the 24 VAC common wire to the primary probe terminal labeled 24G.
Note: The two 24H connections are electrically identical, and the two 24G connections are also electrically identical.
Ancillary Probe Wiring

Note: The last probe in each air measurement station must have the end of line (EOL) switch set for the probe

network (switch 3 [see Figure 16]). If the primary probe output is connected to a BACnet network interface and 

the TDP05K Airflow Measuring System is the end of line in the BACnet network, set the BACnet switch to 1 ON 

(shown in the off position in Figure 16).

Figure 16:  Ancillary Probe Wiring

TDP05K Advanced Thermal Dispersion Probe Airflow Measuring System Installation Instructions

13

Ruskin—CONFIDENTIAL

preliminary —this information may change

Power

1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the

terminals and reconnect them to the controller board.

2. Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended).
3. Connect the 24 VAC hot wire to the primary probe terminal labeled 24H.
4. Connect the 24 VAC common wire to the primary probe terminal labeled 24G.
Note: The two 24H connections are electrically identical, and the two 24G connections are also electrically identical.

Network

1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the

terminals and reconnect them to the controller board.

2. Connect the probe network terminal from the primary probe to the probe network in terminal on the ancillary

probe(s).
a. Connect the shield wire from the primary probe to the Sh Out terminal. The shield only connects on one

end.

b. Connect the 24 AWG black wire from the primary probe terminal labeled Network D- to the ancillary probe

terminal labeled Probe Network D-.

c. Connect the 24 AWG white wire from the primary probe terminal labeled Network D+ to the ancillary probe

terminal labeled Probe Network D+.

3. Connect additional probes in a daisy-chain series.

Note: The last probe in each air measurement station must have the end of line (EOL) switch set for the probe

network (switch 3 [see Figure 16]). If the primary probe output is connected to a BACnet network interface and 

the TDP05K Airflow Measuring System is the end of line in the BACnet network, set the BACnet switch to 1 ON 

(shown in the off position in Figure 16).

Figure 16:  Ancillary Probe Wiring

TDP05K Advanced Thermal Dispersion Probe Airflow Measuring System Installation Instructions

13

Ruskin—CONFIDENTIAL

preliminary —this information may change

3. Connect the shield wire from the primary probe to the Sh terminal. The shield only connects on the output end.
Note: The Shield is connected on one end of each wire run and should never be connected on both ends of one wire.

Power

1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the

terminals and reconnect them to the controller board.

2. Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended).
3. Connect the 24 VAC hot wire to the primary probe terminal labeled 24H.
4. Connect the 24 VAC common wire to the primary probe terminal labeled 24G.
Note: The two 24H connections are electrically identical, and the two 24G connections are also electrically identical.
Ancillary Probe Wiring

Network

1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the

terminals and reconnect them to the controller board.

2. Connect the probe network terminal from the primary probe to the probe network in terminal on the ancillary

probe(s).
a. Connect the shield wire from the primary probe to the Sh Out terminal. The shield only connects on one

end.

b. Connect the 24 AWG black wire from the primary probe terminal labeled Network D- to the ancillary probe

terminal labeled Probe Network D-.

c. Connect the 24 AWG white wire from the primary probe terminal labeled Network D+ to the ancillary probe

terminal labeled Probe Network D+.

3. Connect additional probes in a daisy-chain series.

Figure 16:  Ancillary Probe Wiring

TDP05K Advanced Thermal Dispersion Probe Airflow Measuring System Installation Instructions

13

Ruskin—CONFIDENTIAL

preliminary —this information may change

3. Connect the shield wire from the primary probe to the Sh terminal. The shield only connects on the output end.
Note: The Shield is connected on one end of each wire run and should never be connected on both ends of one wire.

Power

1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the

terminals and reconnect them to the controller board.

2. Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended).
3. Connect the 24 VAC hot wire to the primary probe terminal labeled 24H.
4. Connect the 24 VAC common wire to the primary probe terminal labeled 24G.
Note: The two 24H connections are electrically identical, and the two 24G connections are also electrically identical.
Ancillary Probe Wiring

Network

1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the

terminals and reconnect them to the controller board.

2. Connect the probe network terminal from the primary probe to the probe network in terminal on the ancillary

probe(s).
a. Connect the shield wire from the primary probe to the Sh Out terminal. The shield only connects on one

end.

Note: The last probe in each air measurement station must have the end of line (EOL) switch set for the probe

network (switch 3 [see Figure 16]). If the primary probe output is connected to a BACnet network interface and 

the TDP05K Airflow Measuring System is the end of line in the BACnet network, set the BACnet switch to 1 ON 

(shown in the off position in Figure 16).

Figure 16:  Ancillary Probe Wiring

When the primary and ancillary probes, remote display and network wiring are complete, apply power to the

system. The version number is displayed followed by the number of probes found and total sensors. Confirm

this information is correct for the air measurement system installed. If it is incorrect, check all probe network wiring

and probe address dial settings.

Confirm that no two ancillary probes are set for the same address. Each probe address must be unique on the

probe network to work correctly. The primary probe and remote display are hard-coded addresses and do not

need to be changed or addressed. Confirm the connections are made to the probe network are not to the

BACnet or analog output connections on the primary probe. After the device warms up, the temperature and

flow readings display.

Refer to the TDP05K Advanced Thermal Dispersion Probe Air Flow Measuring System Technical Bulletin

http://www.ruskin.com/catalog/servefile/id/6767 for detailed configuration instructions.

Completing the Wiring

Rec

Rec

Recta

Recta

Rectang

Rectang

Rectang

Rectangular

Rectangular

Rectangular

Rectangular

Rectangular

Rectangular

Rectangular

tangu

ngu

nguular

ular

ular

ct W

ct W

ct W

ct Width

ct Width

ct Width

ct Width

ct Width

idth "A"  =  P

 "A"  =  Prob

 "A"  =  Prob

 "A"  =  Prob

 "A"  =  Prob

 "A"  =  Prob

robe Length

e Length

e Length

e Length

e Length

gth

Table 1:  Number of Probes/Sensors per Probe for Rectangular Duct A

Apppli

cations

 Du

 Du

 Du

 Du

 Du

 Du

 Du

 Du

 Du

 Du

Duct Height 

Duct Height 

"B"

"B"

8"

(203)

12"

(305)

14"

(356)

16"

(406)

18"

(457)

20"

(508)

22"

(559)

24"

(610)

30"

(762)

36"

(914)

42"

(1067)

48"

(1219)

54"

(1372) (1524)

6

(1676)

60"

6"

72"

(1829)

84"

(2134)

96"

(2438)

108"

(2743)

120"

(3048)

8" (203)

1/2

1/2

1/4

1/4

1/4

1/4

1/4

1/4

1/6

1/6

1/6

1/6

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

12" (305)

1/2

1/2

1/4

1/4

1/4

1/4

1/4

1/4

1/6

1/6

1/6

1/6

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

14" (356)

1/2

1/4

1/4

1/4

1/4

1/4

1/6

1/6

1/6

1/6

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

16" (406)

2/2

2/2

2/2

2/2

2/2

2/3

2/3

2/3

1/6

1/6

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

18" (457)

2/2

2/2

2/2

2/2

2/3

2/3

2/3

2/3

1/6

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

1/8

20" (508)

2/2

2/2

2/2

2/3

2/3

2/3

2/3

2/3

2/4

1/8

1/8

1/8

1/8

2/6

2/6

2/6

2/6

2/7

2/8

2/8

2/2

3/2

22" (559)

2/2

2/3

2/3

2/3

2/3

2/3

2/4

1/8

1/8

1/8

2/6

2/6

2/6

2/6

2/7

2/8

2/8

2/8

24" (610)

2/2

2/2

3/2

2/3

2/3

2/3

2/3

2/3

2/4

2/4

1/8

1/8

2/6

2/6

2/6

2/6

2/7

2/8

2/8

2/8

30" (762)

3/2

3/2

3/2

3/2

3/2

2/4

2/4

2/4

2/4

2/4

2/6

2/6

2/6

2/7

2/7

2/8

2/8

2/8

2/8

2/8

" (106

" (914

42

3/2

3/2

3/2

3/2

36

)

4/2

4/2

4/2

2/4

2/4

2/6

2/6

2/6

2/7

2/8

2/8

2/8

2/8

2/8

2/8

2/8

7)

3/2

3/2

4/2

4/2

4/2

4/2

4/2

4/2

2/6

2/6

2/7

2/7

2/8

2/8

2/8

2/8

2/8

2/8

2/8

2/8

48" (1219)

3/2

3/2

4/2

4/2

4/2

4/2

4/2

4/2

3/4

2/6

2/7

2/8

2/8

2/8

2/8

2/8

2/8

2/8

2/8

2/8

554" (1372

4/2

4/2

4/2

4/2

4/2

4/2

3/4

3/4

3/4

2/7

2/8

2/8

2/8

2/8

2/8

4/4

2/8

2/8

2/8

2/8

660" (1524

4/2

4/2

4/2

4/2

4/2

3/4

3/4

3/4

4/4

4/4

2/8

2/8

2/8

4/4

4/4

4/4

4/4

2/8

2/8

2/8

666" (1676

4/2

4/2

4/2

4/2

4/3

3/4

3/4

3/4

4/4

4/4

4/4

2/8

2/8

4/4

4/4

4/4

4/4

4/4

2/8

2/8

772" (1829

4/2

4/2

4/2

4/2

4/3

3/4

3/4

3/4

4/4

4/4

4/4

2/8

4/4

4/4

4/4

4/4

4/4

4/4

4/4

2/8

884" (2134

4/2

4/2

4/2

4/2

4/3

3/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

10

9

8

4/2

4/2

4/2

4/2

4/3

4/4

4/4

4/4

44/

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

6" (2438)

" (2743)

4/2

4/2

4/2

4/2

4/3

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

120" (3048)

4/2

4/2

4/2

4/2

4/3

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

4/4

Airflow-IQ Start-up & Commissioning Guide 

17

3.  Connect the shield wire from the primary probe to the Shield terminal. The shield only connects on the output end.
Note:

 

The Shield is connected on one end of each wire run and should never be connected on both ends of one wire.

Table 1: Number of Probes/Sensors per Probe for Rectangular Duct Applications

Содержание AIRFLOW-IQ

Страница 1: ...Start up Commissioning Guide Model AIRFLOW IQ Electronic Air Measuring Station with BACnet Actuator and Class 1A Damper ALL STATED SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT PRIOR NOTICE OR OBLIGATI...

Страница 2: ...ation Guidelines 5 Construction Details 6 Ideal Installations Air Measurement Station Placements 7 8 Actuator Product Description 9 BACnet Enabled Factory Supplied Controller 9 10 Log on to Actuator 1...

Страница 3: ...lable at www Ruskin com at this URL http www ruskin com catalog servefile id 6766 or via this QR Code APPLICATIONS Ruskin model AIRFLOW IQ is a turn key solution that combines the features of Ruskin s...

Страница 4: ...mponents carrying hazardous voltage can cause electric shock and may result in severe personal injury or death Risque de d charge lectrique D brancher l alimentation avant de r aliser tout branchement...

Страница 5: ...g the damper After the damper is installed the shaft location cannot be changed without removing the damper The jackshaft when pres ent will always be in the leaving air stream The AIRFLOW IQ has a sp...

Страница 6: ...1 8 1 8 1 8 1 8 1 8 1 8 1 8 1 8 16 406 2 2 2 2 2 2 2 2 2 3 2 3 2 3 1 6 1 6 1 8 1 8 1 8 1 8 1 8 1 8 1 8 1 8 1 8 1 8 18 457 2 2 2 2 2 2 2 2 2 3 2 3 2 2 2 2 1 8 1 8 1 8 1 8 1 8 1 8 1 8 1 8 1 8 1 8 1 8 2...

Страница 7: ...y sampling uncertainty can be reduced by adding more sensors and when necessary more probes to help compensate for locations that do not have sufficient spacing between upstream and downstream obstruc...

Страница 8: ...ontrol Mode To operate the Airflow IQ as a modulating damper change the DamperMode BACnet data point see Table 1 from CurrentAirflow to DamperPosition Manual Override Close Damper manual override clos...

Страница 9: ...9 Airflow IQ Start up Commissioning Guide Field power wiring use 18 ga wire or 16 ga if over 25...

Страница 10: ...en the network interface is not used Direct Position Control is possible via BACNET or Analog Input corresponding to Percent input FEATURES Setup via integrated Web Server and Ethernet IP connection d...

Страница 11: ...way 192 168 0 1 Configuring the air measurement actuator requires logging on to it with a laptop using Google Chrome Make sure the lap top s WiFi is turned off to avoid a problem In the address bar a...

Страница 12: ...to DDC Setpoint BACnet or 0 10VDC Input Actuator Modulates to Maintain Flow Setpoint BACnet MS TP or IP allows Monitoring and Con guraIon Ruskin VAFB24 BAC RAMS Actuator WEB Interface Actuator Reads...

Страница 13: ...Current Airflow Rate Setpoint AI 2 cfm Airflow Current Airflow Rate AI 3 R cfm AirVelocity Current Air Velocity AI 4 R fpm DamperPosition Damper Position Feedback AI 5 R pct DpReading Differential Pr...

Страница 14: ...e device BACnet Device Address IP Address settings MS TP Address is done via the integrated web server BACnet Standard Device Profile BACnet Application Specific Controller B ASC BACnet Interoperabili...

Страница 15: ...Analog Output Description Present_Value Analog Value Description Present_Value Binary Input Description Active_Text Inactive_Text Binary Output Description Present_Value Active_Text Inactive_Text Reli...

Страница 16: ...inimum bend radius of 3 5 in 89 mm IMPORTANT Do not run the probe wiring in the same conduit as AC power wiring or with wiring used to supply highly inductive loads such as motors contactors and relay...

Страница 17: ...ONFIDENTIAL Wiring Connections Primary Probe Wiring BACnet Output 1 Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires Tighten the terminals and reconnect th...

Страница 18: ...ly connects on the output end Note The Shield is connected on one end of each wire run and should never be connected on both ends of one wire Power 1 Carefully remove the top of the Phoenix Contact sc...

Страница 19: ...ades and other internal parts may need annual cleaning to avoid dirt build up MAINTENANCE Remove any foreign material Verify that hardware used to install damper does not contact moving parts of the d...

Страница 20: ...Duct Diameter Duct Area Site Elevation Relative Humidity Flow Units Output Lockout Display Configuration Select parameters for displayed data Display Filter Display Config Display Units Display Flow...

Страница 21: ...elocity2 System at Point 22 Point 2 Velocity2 System at Point 32 Point 3 Velocity2 Calculate K Factor Menu Inactivity Timeout Selects a time the device returns to normal Menu Timeout Menu Timeout oper...

Страница 22: ...n Use Automatic K factor Configuration and use 1 point calibration if only gain is required If flow is non linear use two or three point calibration feature Install additional probes to provide more s...

Страница 23: ...nting screws from the mounting plates on both sides of the thermal dispersion probe 3 Remove the lock nut and the washer from the mounting stud 4 Slide the probe out of the duct from the side with the...

Страница 24: ...1 in w g Approximate Shipping Weight 12 lb 5 4 kg for TDP05K Airflow Measuring System with two probes Measuring stations are tested at an AMCA CertifiedLaboratory using instrumentation and procedures...

Отзывы: