Airflow-IQ Start-up & Commissioning Guide
Power
1 . Carefully remove the top of the Phoenix Contact
®
screw terminal connector and insert the wires . Tighten the
terminals and reconnect them to the controller board .
2 . Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended) .
3 . Connect the 24 VAC hot wire to the primary probe terminal labeled 24H .
4 . Connect the 24 VAC common wire to the primary probe terminal labeled 24G .
Note:
The two 24H connections are electrically identical, and the two 24G connections are also electrically identical .
Completing the Wiring
When the primary and ancillary probes, remote display and network wiring are complete, apply power to the system .
The version number is displayed followed by the number of probes found and total sensors . Confirm this informa-
tion is correct for the air measurement system installed . If it is incorrect, check all probe network wiring and probe
address dial settings .
Confirm that no two ancillary probes are set for the same address . Each probe address must be unique on the probe
network to work correctly . The primary probe and remote display are hard-coded addresses and do not need to be
changed or addressed . Confirm the connections are made to the probe network are not to the BACnet or analog
output connections on the primary probe . After the device warms up, the temperature and flow readings display .
Refer to the TDP05K Advanced Thermal Dispersion Probe Air Flow Measuring System Technical Bulletin
http://www .ruskin .com/catalog/servefile/id/6767 for detailed configuration instructions .
TDP05K Advanced Thermal Dispersion Probe Airflow Measuring System Installation Instructions
13
Ruskin—CONFIDENTIAL
preliminary —this information may change
3. Connect the shield wire from the primary probe to the Sh terminal. The shield only connects on the output end.
Note: The Shield is connected on one end of each wire run and should never be connected on both ends of one wire.
Power
1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the
terminals and reconnect them to the controller board.
2. Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended).
3. Connect the 24 VAC hot wire to the primary probe terminal labeled 24H.
4. Connect the 24 VAC common wire to the primary probe terminal labeled 24G.
Note: The two 24H connections are electrically identical, and the two 24G connections are also electrically identical.
Ancillary Probe Wiring
Network
1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the
terminals and reconnect them to the controller board.
2. Connect the probe network terminal from the primary probe to the probe network in terminal on the ancillary
probe(s).
a. Connect the shield wire from the primary probe to the Sh Out terminal. The shield only connects on one
end.
b. Connect the 24 AWG black wire from the primary probe terminal labeled Network D- to the ancillary probe
terminal labeled Probe Network D-.
c. Connect the 24 AWG white wire from the primary probe terminal labeled Network D+ to the ancillary probe
terminal labeled Probe Network D+.
3. Connect additional probes in a daisy-chain series.
Note: The last probe in each air measurement station must have the end of line (EOL) switch set for the probe
network (switch 3 [see Figure 16]). If the primary probe output is connected to a BACnet network interface and
the TDP05K Airflow Measuring System is the end of line in the BACnet network, set the BACnet switch to 1 ON
(shown in the off position in Figure 16).
TDP05K Advanced Thermal Dispersion Probe Airflow Measuring System Installation Instructions
13
Ruskin—CONFIDENTIAL
preliminary —this information may change
3. Connect the shield wire from the primary probe to the Sh terminal. The shield only connects on the output end.
Note: The Shield is connected on one end of each wire run and should never be connected on both ends of one wire.
Power
1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the
terminals and reconnect them to the controller board.
2. Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended).
3. Connect the 24 VAC hot wire to the primary probe terminal labeled 24H.
4. Connect the 24 VAC common wire to the primary probe terminal labeled 24G.
Note: The two 24H connections are electrically identical, and the two 24G connections are also electrically identical.
Ancillary Probe Wiring
Note: The last probe in each air measurement station must have the end of line (EOL) switch set for the probe
network (switch 3 [see Figure 16]). If the primary probe output is connected to a BACnet network interface and
the TDP05K Airflow Measuring System is the end of line in the BACnet network, set the BACnet switch to 1 ON
(shown in the off position in Figure 16).
Figure 16: Ancillary Probe Wiring
TDP05K Advanced Thermal Dispersion Probe Airflow Measuring System Installation Instructions
13
Ruskin—CONFIDENTIAL
preliminary —this information may change
Power
1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the
terminals and reconnect them to the controller board.
2. Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended).
3. Connect the 24 VAC hot wire to the primary probe terminal labeled 24H.
4. Connect the 24 VAC common wire to the primary probe terminal labeled 24G.
Note: The two 24H connections are electrically identical, and the two 24G connections are also electrically identical.
Network
1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the
terminals and reconnect them to the controller board.
2. Connect the probe network terminal from the primary probe to the probe network in terminal on the ancillary
probe(s).
a. Connect the shield wire from the primary probe to the Sh Out terminal. The shield only connects on one
end.
b. Connect the 24 AWG black wire from the primary probe terminal labeled Network D- to the ancillary probe
terminal labeled Probe Network D-.
c. Connect the 24 AWG white wire from the primary probe terminal labeled Network D+ to the ancillary probe
terminal labeled Probe Network D+.
3. Connect additional probes in a daisy-chain series.
Note: The last probe in each air measurement station must have the end of line (EOL) switch set for the probe
network (switch 3 [see Figure 16]). If the primary probe output is connected to a BACnet network interface and
the TDP05K Airflow Measuring System is the end of line in the BACnet network, set the BACnet switch to 1 ON
(shown in the off position in Figure 16).
Figure 16: Ancillary Probe Wiring
TDP05K Advanced Thermal Dispersion Probe Airflow Measuring System Installation Instructions
13
Ruskin—CONFIDENTIAL
preliminary —this information may change
3. Connect the shield wire from the primary probe to the Sh terminal. The shield only connects on the output end.
Note: The Shield is connected on one end of each wire run and should never be connected on both ends of one wire.
Power
1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the
terminals and reconnect them to the controller board.
2. Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended).
3. Connect the 24 VAC hot wire to the primary probe terminal labeled 24H.
4. Connect the 24 VAC common wire to the primary probe terminal labeled 24G.
Note: The two 24H connections are electrically identical, and the two 24G connections are also electrically identical.
Ancillary Probe Wiring
Network
1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the
terminals and reconnect them to the controller board.
2. Connect the probe network terminal from the primary probe to the probe network in terminal on the ancillary
probe(s).
a. Connect the shield wire from the primary probe to the Sh Out terminal. The shield only connects on one
end.
b. Connect the 24 AWG black wire from the primary probe terminal labeled Network D- to the ancillary probe
terminal labeled Probe Network D-.
c. Connect the 24 AWG white wire from the primary probe terminal labeled Network D+ to the ancillary probe
terminal labeled Probe Network D+.
3. Connect additional probes in a daisy-chain series.
Figure 16: Ancillary Probe Wiring
TDP05K Advanced Thermal Dispersion Probe Airflow Measuring System Installation Instructions
13
Ruskin—CONFIDENTIAL
preliminary —this information may change
3. Connect the shield wire from the primary probe to the Sh terminal. The shield only connects on the output end.
Note: The Shield is connected on one end of each wire run and should never be connected on both ends of one wire.
Power
1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the
terminals and reconnect them to the controller board.
2. Connect the 24 VAC power wires to the primary probe using 15 VA power (recommended).
3. Connect the 24 VAC hot wire to the primary probe terminal labeled 24H.
4. Connect the 24 VAC common wire to the primary probe terminal labeled 24G.
Note: The two 24H connections are electrically identical, and the two 24G connections are also electrically identical.
Ancillary Probe Wiring
Network
1. Carefully remove the top of the Phoenix Contact screw terminal connector and insert the wires. Tighten the
terminals and reconnect them to the controller board.
2. Connect the probe network terminal from the primary probe to the probe network in terminal on the ancillary
probe(s).
a. Connect the shield wire from the primary probe to the Sh Out terminal. The shield only connects on one
end.
Note: The last probe in each air measurement station must have the end of line (EOL) switch set for the probe
network (switch 3 [see Figure 16]). If the primary probe output is connected to a BACnet network interface and
the TDP05K Airflow Measuring System is the end of line in the BACnet network, set the BACnet switch to 1 ON
(shown in the off position in Figure 16).
Figure 16: Ancillary Probe Wiring
When the primary and ancillary probes, remote display and network wiring are complete, apply power to the
system. The version number is displayed followed by the number of probes found and total sensors. Confirm
this information is correct for the air measurement system installed. If it is incorrect, check all probe network wiring
and probe address dial settings.
Confirm that no two ancillary probes are set for the same address. Each probe address must be unique on the
probe network to work correctly. The primary probe and remote display are hard-coded addresses and do not
need to be changed or addressed. Confirm the connections are made to the probe network are not to the
BACnet or analog output connections on the primary probe. After the device warms up, the temperature and
flow readings display.
Refer to the TDP05K Advanced Thermal Dispersion Probe Air Flow Measuring System Technical Bulletin
http://www.ruskin.com/catalog/servefile/id/6767 for detailed configuration instructions.
Completing the Wiring
Rec
Rec
Recta
Recta
Rectang
Rectang
Rectang
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
Rectangular
tangu
ngu
nguular
ular
ular
ct W
ct W
ct W
ct Width
ct Width
ct Width
ct Width
ct Width
idth "A" = P
"A" = Prob
"A" = Prob
"A" = Prob
"A" = Prob
"A" = Prob
robe Length
e Length
e Length
e Length
e Length
gth
Table 1: Number of Probes/Sensors per Probe for Rectangular Duct A
Apppli
cations
Du
Du
Du
Du
Du
Du
Du
Du
Du
Du
Duct Height
Duct Height
"B"
"B"
8"
(203)
12"
(305)
14"
(356)
16"
(406)
18"
(457)
20"
(508)
22"
(559)
24"
(610)
30"
(762)
36"
(914)
42"
(1067)
48"
(1219)
54"
(1372) (1524)
6
(1676)
60"
6"
72"
(1829)
84"
(2134)
96"
(2438)
108"
(2743)
120"
(3048)
8" (203)
1/2
1/2
1/4
1/4
1/4
1/4
1/4
1/4
1/6
1/6
1/6
1/6
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
12" (305)
1/2
1/2
1/4
1/4
1/4
1/4
1/4
1/4
1/6
1/6
1/6
1/6
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
14" (356)
1/2
1/4
1/4
1/4
1/4
1/4
1/6
1/6
1/6
1/6
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
16" (406)
2/2
2/2
2/2
2/2
2/2
2/3
2/3
2/3
1/6
1/6
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
18" (457)
2/2
2/2
2/2
2/2
2/3
2/3
2/3
2/3
1/6
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
1/8
20" (508)
2/2
2/2
2/2
2/3
2/3
2/3
2/3
2/3
2/4
1/8
1/8
1/8
1/8
2/6
2/6
2/6
2/6
2/7
2/8
2/8
2/2
3/2
22" (559)
2/2
2/3
2/3
2/3
2/3
2/3
2/4
1/8
1/8
1/8
2/6
2/6
2/6
2/6
2/7
2/8
2/8
2/8
24" (610)
2/2
2/2
3/2
2/3
2/3
2/3
2/3
2/3
2/4
2/4
1/8
1/8
2/6
2/6
2/6
2/6
2/7
2/8
2/8
2/8
30" (762)
3/2
3/2
3/2
3/2
3/2
2/4
2/4
2/4
2/4
2/4
2/6
2/6
2/6
2/7
2/7
2/8
2/8
2/8
2/8
2/8
" (106
" (914
42
3/2
3/2
3/2
3/2
36
)
4/2
4/2
4/2
2/4
2/4
2/6
2/6
2/6
2/7
2/8
2/8
2/8
2/8
2/8
2/8
2/8
7)
3/2
3/2
4/2
4/2
4/2
4/2
4/2
4/2
2/6
2/6
2/7
2/7
2/8
2/8
2/8
2/8
2/8
2/8
2/8
2/8
48" (1219)
3/2
3/2
4/2
4/2
4/2
4/2
4/2
4/2
3/4
2/6
2/7
2/8
2/8
2/8
2/8
2/8
2/8
2/8
2/8
2/8
554" (1372
4/2
4/2
4/2
4/2
4/2
4/2
3/4
3/4
3/4
2/7
2/8
2/8
2/8
2/8
2/8
4/4
2/8
2/8
2/8
2/8
660" (1524
4/2
4/2
4/2
4/2
4/2
3/4
3/4
3/4
4/4
4/4
2/8
2/8
2/8
4/4
4/4
4/4
4/4
2/8
2/8
2/8
666" (1676
4/2
4/2
4/2
4/2
4/3
3/4
3/4
3/4
4/4
4/4
4/4
2/8
2/8
4/4
4/4
4/4
4/4
4/4
2/8
2/8
772" (1829
4/2
4/2
4/2
4/2
4/3
3/4
3/4
3/4
4/4
4/4
4/4
2/8
4/4
4/4
4/4
4/4
4/4
4/4
4/4
2/8
884" (2134
4/2
4/2
4/2
4/2
4/3
3/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
10
9
8
4/2
4/2
4/2
4/2
4/3
4/4
4/4
4/4
44/
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
6" (2438)
" (2743)
4/2
4/2
4/2
4/2
4/3
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
120" (3048)
4/2
4/2
4/2
4/2
4/3
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
4/4
Airflow-IQ Start-up & Commissioning Guide
17
3. Connect the shield wire from the primary probe to the Shield terminal. The shield only connects on the output end.
Note:
The Shield is connected on one end of each wire run and should never be connected on both ends of one wire.
Table 1: Number of Probes/Sensors per Probe for Rectangular Duct Applications