RUNLUCKY SHOWER SOFTENER
8
2.3.3. Drain Pipeline Installation
The product has been installed drain pipeline in the factory. If the drain pipeline is needed longer, as
sewer is far away or other reason, please use 1/4 "quick connector to connect the drain pipeline. Be sure
the flow control in drain pipeline placed as shown in Figure 22. Please contact your distributor if you lose
it.
2.3.4. Power Cable Installation
The product needs the power supply far away from the water mist, when the machine is installed. The
plug of power cable uses the seal design. When installation, please tighten the connection nut,
installation as Figure 23.
3.Trial Running
1.Power on, slowly open the source water, let the machine run in service position for about five minutes
to check if there is any leakage on connection. If leak, please tighten the leaking area.
2.For the machine firstly use, there may be a little yellow water from the outlet ,this is a normal
phenomenon. Because the resin is new, just rinse it.
Note: Remove the plug on drain pipeline when uses the product to prevent no water drain out in