![Ruijie RG-AP810-L Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/ruijie/rg-ap810-l/rg-ap810-l_hardware-installation-and-reference-manual_1499702030.webp)
Hardware Installation and Reference Guide Verifying Operating Status
21
4
Verifying Operating Status
4.1
Configuring the Environment
Use a power adapter or PoE to power the AP.
Setting up the Environment
Verify that the AP is properly connected to the power source.
Connect the AP to an AC through a twisted pair cable.
When the AP is connected to a PC, verify that the PC and PoE switch are properly grounded.
4.2
Powering up the AP
4.2.1
Checking Environment before Power-on
Verify that the power supply is properly connected.
Verify that the input voltage matches the specification of the AP.
4.2.2
Checking Environment after Power-on
After power-on, you are advised to check the following to ensure normal operation of the AP.
Check if any message is printed on the Web-based configuration interface of the device.
Check if the LED works normally.