background image

 

 

Figure 4-2 Ventilation of RG-S12006   

 

Checking Before Installation 

Before powering on RG-S12000, make sure that: 

 

The fan meets the current requirements. For details, refer to 

Fan

 

The power supply is suitable. For details, refer to 

Power Supply

 

The power supply is fastened with screws properly. 

 

Do not power on the system or do maintenance when the system is powered on by one person. 

 

Make sure that there is no potential risk in the operating area, for example, the power is not 

grounded; the power is not grounded reliably; or the ground is wet. 

 

Keep the switch away from wet or liquid. 

 

Be aware of the emergent power switch in the room. Once an accident occurs, shut down the 

power switch. 

 

Make sure that all the power systems are powered off when necessary. 

 

Make sure that power cables are closely connected to the power module. 

 

Make sure that power cables are long enough. 

 

Make sure whether the rated current of power bank is larger than 16A and the power bank is 

grounded well. 

 

Each power module is supplied with power by a power socket. 

 

Make sure that the blank panels are installed in the slots which are inserted with line cards or 

management boards for the purpose of system heat dissipation. 

 

Содержание RG-S12000 Series

Страница 1: ...RG S12000 Series Switches Quick Installation Guide V1 22...

Страница 2: ...ten consent of Ruijie Networks is prohibited are registered trademarks of Ruijie Networks Counterfeit is strictly prohibited Exemption statement This document is provided as is The contents of this do...

Страница 3: ...ocuments Documents Description Configuration Guide Describes network protocols and related mechanisms that supported by the product with configuration examples Command Reference Describes the related...

Страница 4: ...tion Requirements 8 Checking Before Installation 10 Fan 11 Power Supply 11 Specification 11 Precaution 11 System Grounding 11 Grounding Requirements 11 Grounding description 12 Rack grounding pole 12...

Страница 5: ...rectly looking at the optical interfaces or fibers may damage your eyes Serial Interface Safety Warning Hot plugging in a serial interface may damage your terminal Please power off the terminal before...

Страница 6: ...ngine modules and provides 4 service module slots Safety Precautions for Movement RG S12000 Series is large and heavy When you carry them please pay attention to the following requirements Remove all...

Страница 7: ...damage you must pay attention to the following Proper grounding of the switch and floor Dust prevention measures are taken in the room An appropriate humidity is maintained Do not wear loose clothes...

Страница 8: ...l fibers and distribution cables Connect the interfaces Ruler long tapeline marker pen Measure the installation position Common tools Bolts diagonal pliers straps Mount the chassis Anti static tool Pr...

Страница 9: ...ent spacing is reserved at the ventilation openings to ensure normal heat dissipation After various cables have been connected they should be arranged into bundles or placed on the cabling rack to avo...

Страница 10: ...not grounded reliably or the ground is wet Keep the switch away from wet or liquid Be aware of the emergent power switch in the room Once an accident occurs shut down the power switch Make sure that...

Страница 11: ...bles to connect power modules The dust in the air may block the air outlet of an air filter after the air filter is used for a long time thus affecting system ventilation and heat dissipation It is re...

Страница 12: ...bank Lightning prevention ground prevents lightning shock The lightning prevention system of general equipment is a separate system composed of lightning rod down conductor and grounding system Figure...

Страница 13: ...ounding pole of the chassis The antistatic wrist strap jack is located on the front panel of the chassis marked with yellow ESD 4 The antistatic wrist strap is grounded well and the DC electric resist...

Страница 14: ...d the Alarm LED is red Troubleshooting 1 Check if the supervisor engine gets loose If so install the supervisor engine again and ensure that it is inserted tightly before you tighten the fastening scr...

Страница 15: ...Input delete config text Press Enter 5 The Are you sure you want to delete config text No yes is shown on the interface Input y and press Enter to delete it 6 Input dir to view current file configurat...

Страница 16: ...connected to the receiving end of the other optical interface You can check by changing the sequence in which the two optical fibers are connected on the optical module 2 Check whether the optical mod...

Отзывы: