background image

 

 

port is faulty.   

[Troubleshooting]  

Check whether the service card module is connected correctly and the summary power of the 

newly-inserted linecard and other modules in the system exceeds the maximum power. If so, please 

add more power modules to provide the enough power for the power supply. If all checkings are OK, 

but the newly-inserted linecard still cannot be powered on, please contact Ruijie Customer Service 

Department for technical support. 

 

Fault 10: The link cannot be set up between optical interfaces   

[Fault Description] 

The system runs normally. After the optical interface is inserted into the optical module and the 

optical fiber is properly connected, the link cannot be set up.   

[Troubleshooting]  

First confirm whether the interface is a copper/fiber combo interface. If yes, it should be configured in 

fiber mode. Then, do as follows: 1) Check whether the receiving and sending ends are wrongly 

connected. The sending end of the optical interface needs to be connected to the receiving end of 

the other optical interface. You can check by changing the sequence in which the two optical fibers 

are connected on the optical module. 2) Check whether the optical module wavelength of the two 

sides are consistent. For example, an optical module of 1310nm wavelength cannot be connected to 

an optical module of 1550nm wavelength. 3) Check whether the distance between the two sides 

exceeds the length indicated on the optical module. 4) Check whether the rates of the two sides 

match and whether the optical fiber type meets requirements. In addition, for ports supporting 

different rates, check whether rate modes are configured correctly. 

 

Fault 11: Some ports can supply power via PoE, while others cannot.   

[Fault Description] 

The ports are connected to PoE devices. There is power on some ports, but no power on others.   

[Troubleshooting]  

1) Check whether the ports without power are shut down manually by the software. 

2) Check whether the power provided by PoE is sufficient. If not, power will be supplied to only ports 

of higher priority. 

 

 

If above mentioned methods do not take effect, please contact Ruijie Networks for technology 

assistance. 

 

Содержание RG-S12000 Series

Страница 1: ...RG S12000 Series Switches Quick Installation Guide V1 22...

Страница 2: ...ten consent of Ruijie Networks is prohibited are registered trademarks of Ruijie Networks Counterfeit is strictly prohibited Exemption statement This document is provided as is The contents of this do...

Страница 3: ...ocuments Documents Description Configuration Guide Describes network protocols and related mechanisms that supported by the product with configuration examples Command Reference Describes the related...

Страница 4: ...tion Requirements 8 Checking Before Installation 10 Fan 11 Power Supply 11 Specification 11 Precaution 11 System Grounding 11 Grounding Requirements 11 Grounding description 12 Rack grounding pole 12...

Страница 5: ...rectly looking at the optical interfaces or fibers may damage your eyes Serial Interface Safety Warning Hot plugging in a serial interface may damage your terminal Please power off the terminal before...

Страница 6: ...ngine modules and provides 4 service module slots Safety Precautions for Movement RG S12000 Series is large and heavy When you carry them please pay attention to the following requirements Remove all...

Страница 7: ...damage you must pay attention to the following Proper grounding of the switch and floor Dust prevention measures are taken in the room An appropriate humidity is maintained Do not wear loose clothes...

Страница 8: ...l fibers and distribution cables Connect the interfaces Ruler long tapeline marker pen Measure the installation position Common tools Bolts diagonal pliers straps Mount the chassis Anti static tool Pr...

Страница 9: ...ent spacing is reserved at the ventilation openings to ensure normal heat dissipation After various cables have been connected they should be arranged into bundles or placed on the cabling rack to avo...

Страница 10: ...not grounded reliably or the ground is wet Keep the switch away from wet or liquid Be aware of the emergent power switch in the room Once an accident occurs shut down the power switch Make sure that...

Страница 11: ...bles to connect power modules The dust in the air may block the air outlet of an air filter after the air filter is used for a long time thus affecting system ventilation and heat dissipation It is re...

Страница 12: ...bank Lightning prevention ground prevents lightning shock The lightning prevention system of general equipment is a separate system composed of lightning rod down conductor and grounding system Figure...

Страница 13: ...ounding pole of the chassis The antistatic wrist strap jack is located on the front panel of the chassis marked with yellow ESD 4 The antistatic wrist strap is grounded well and the DC electric resist...

Страница 14: ...d the Alarm LED is red Troubleshooting 1 Check if the supervisor engine gets loose If so install the supervisor engine again and ensure that it is inserted tightly before you tighten the fastening scr...

Страница 15: ...Input delete config text Press Enter 5 The Are you sure you want to delete config text No yes is shown on the interface Input y and press Enter to delete it 6 Input dir to view current file configurat...

Страница 16: ...connected to the receiving end of the other optical interface You can check by changing the sequence in which the two optical fibers are connected on the optical module 2 Check whether the optical mod...

Отзывы: