![Ruijie Networks RG-EasyGate Series Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/ruijie-networks/rg-easygate-series/rg-easygate-series_hardware-installation-manual_1499724028.webp)
RG-EasyGate Series Hardware Installation Guide V1.28
After building the configuration environment, you can then power on the breakout gateway.
Powering on the Breakout Gateway
Checks before Power-on
Before power-on, perform the following checks on the breakout gateway:
Whether the power cable and the ground wire are properly connected;
Whether the power voltage is consistent with the requirement of the breakout gateway.
Whether the configuration cable is properly connected, and whether the microcomputer or terminal for gateway
configuration is started or configured.
Before powering on the breakout gateway, be aware of the location of the power switch of the breakout
gateway to timely cut off power supply in case of any accident.
Powering on the Breakout Gateway
Turn on the power supply switch of the breakout gateway
Turn on the power switch of the breakout gateway and set the power switch to "ON" position.
Checks after Power-on
After the breakout gateway is powered on, check the following items:
Whether the ventilation system works normally
Checking procedure: After power-on, you can hear the fan working; put your hand nearby the vent hole of breakout
gateway to feel the airflow.