Below is an example of how someone would use this.
Let’s say a building has 3 floors. You’re looking to monitor water
temp from all boilers, runtime from all
generators, air temp from AC’s and speed from the exhaust fans. The first image shows how you would
configure the data points. Since we want to monitor 4 points on each floor, you’ll need a total of 12
points. Once the Groups and Devices have been defined, come back to this page to assign a device to a
data point name.
The second image displays how to setup the Groups and Devices. We are going to define floor numbers
as a Groups and define all devices we are monitoring as displayed. Lastly, we can assign each device to a
group.
Note: see below for naming rules.