M0416-1 version 3.2
13
3.2.2 Visual inspection and cleaning of tool attachment
The following maintenance activities should be carried out on the TA every 2
nd
week.
Action
Note
Clean contact surface (electrical versions only)
Wipe the contact surface
with a lint free cloth.
Check cables and hoses
Check cables and hoses
for damages and
squeezing, replace if
damaged.
Check tool attachment in general
Check the tool attachment
for damages. For
replacement see
section
4.2
.
3.2.3 Cleaning and lubrication of tool changer
The following maintenance activities should be carried out on the TC every 6
th
month or
after 250,000 tool changes, whichever comes first.
Action
Note
Clean locking balls
Check the locking balls
and wipe them clean with
a lint free cloth.
WARNING!
Risk of getting
squeezed between piston
and ball holder when the
piston is taking closed
position
Содержание Compact Series
Страница 2: ...2 M0416 1 version 3 2 ...
Страница 21: ...M0416 1 version 3 2 21 ...
Страница 22: ...22 M0416 1 version 3 2 ...