11
Maintenance
Required maintenance items will be indicated by messages, which only can be removed after correct
replacement and confirmation by a trained Lab Technician (quarterly maintenance) or Field Service Engineer
(quarterly maintenance/yearly maintenance.
Inform the Lab Technician or your Field Service for performing maintenance as soon as possible. We
recommend performing the maintenance in time to be sure the instrument will produce reagent as required.
Delayed maintenance can result in poor quality, instrument failure and downtime.
Replacing Vent Filter, Peristaltic pump tubes, Pick-up tubes and End filters can be performed by the Lab
Technician. It is advisable performing maintenance outside peak hours because production will be stopped
during replacements.
The yearly maintenance and incidental replacement of other parts can only be performed by the Field
Service Engineer.
If the instrument is in standby mode after maintenance and/or repair without any errors, the instrument can
be used for production.
Maintenance
72
MRN-184-EN Version 6 (05-01-2022)
Содержание RPI
Страница 1: ...Instructions for Use RPI MRN 184 EN Version 6 05 01 2022...
Страница 2: ......
Страница 39: ...Calibration procedures MRN 184 EN Version 6 05 01 2022 39...