21
SET PANELS
Set the wall panels on the over dig supporting ledge (also
known as the panel shelf) leaning them back against the
side of the excavation in the proper order as shown on
your dig spec. Be sure to place the skimmer and return
inlets in the desired locations.
THE SKIMMER AND RETURN INLET PLACEMENT
The desired placement of the water recirculation inlet fittings (returns) and skimmer may be
marked on the swimming pool construction plan. It is best to place the skimmer near the center
of one of the long sides of your pool and downwind of the generally prevailing breeze direction
experienced in this area. This will enable the wind to help direct surface dirt and debris to the
skimmer for removal from the pool! Pools with 2 skimmers can locate them on the same side or
on opposite corners. In addition, thoughtful consideration should be given to the circulation
pattern of the water when placing inlets. Strive to eliminate all dead spots in corners by evenly
spacing the returns for maximum coverage.
On diving pools, a safety rope with floats must be anchored to each side of the pool a minimum
of one foot, but no more than two feet, into the shallow end from the breakover. With that in
mind, be certain that the skimmer opening will not be in line with or near the rope and floats.
NON-VINYL COVERED STEPS
For vinyl overlay steps, see Appendix C on page 59.
When using steps, individual manufacturer instructions should be followed for proper
installation procedures for the step ordered with your pool kit. The step instructions are
attached to the steps along with the faceplate screws. When deciding where to place your step,
keep in mind that step(s) should not go past the shallow end breakpoint.
TOOLS
Possible Tools: Drill, Rope, C-Clamp, Rebar Stakes
TIP
Panels of the same size and radius are interchangeable
TIP
The step takes the place of any
wall panel of equal size on the
dig spec.