
RVV Gen II KO Service and Parts Manual
22
SECTION 3: Vender Programming
Figure 3.2.
•
Calibrate
Pressing <enter> at the “Calibrate” prompt will cause
the controller to enter the vend mechanism calibration
routine. This routine allows the operator to calibrate
shelf and delivery port positions. Upon entry into
this routine, the display will show “Password.”
Pressing <up> or <down> will scroll through menu
options “Password,” “Cabinet,” “Shelf,” “Shelf X,
Position 1,” and “Port X.”
Pressing <enter> at the “Password” prompt will cause
the controller to wait for the calibration password.
The display will go blank and display an asterisk
for each of the four characters. If the password is
correct, the display will show “Cabinet”; otherwise,
the display will show “Calibration.” The calibration
password is “3456.” If the password is entered
correctly, “Saved” will be shown whenever the
user attempts to save a position or a shelf number.
Otherwise, the system displays “Not Saved.”
Note:
“Password” will be removed from the menu once the
correct password has been entered. If the controller is
taken out of “Calibrate,” the password will need to be
re-entered.
Pressing <enter> at the “Cabinet” prompt will cause
the controller to display the current setting for the
cabinet type. When installed in the RVV Gen II, the
controller should always be set to “Gen II.” If set
incorrectly, press <up> until the correct cabinet setting
is displayed; then, press <enter>. The display will
return to the “Cabinet” prompt. Press <up> to go to
the next prompt, “Shelf.”
Pressing <enter> at the “Shelf” prompt will cause the
controller to display the current number of shelves
the system believes are available. Pressing <up> or
<down> will cycle through the number of shelves
available (5 - 8). Pressing <enter> will save a new
total of shelves available across the system. Pressing
<exit> will return the user to the “Shelf” prompt.
Note: It is up to the user to correctly set the number
of shelves that is in use by the system. Changing the
number of shelves in use by the system will require
the vender to be recalibrated. In addition, selection
settings (“Price Program,” “StS Programming,”
“Select Discount,” etc.) will possibly need to be
redone to match users’ desires, to account for more or
less shelves.
Pressing <enter> at any of the “Shelf X, Position 1”
prompt will cause the controller to enter the shelf
calibration routine. The picker cup will move to the
calibration position for the desired shelf. The <left>
and <right> keys are used to move the cup left or right
until the left wall of the picker cup is aligned with the
right edge of the cell label for cell 4. This is shown in
Figure 3.2.
Note: The cup will not move to the shelf
position if the door is open or the cup is currently in
motion. The shelf position will not be saved if the cup
is currently in motion.
Pressing <enter> at the “Port X” prompt will cause
the controller to enter the port calibration routine.
The picker cup will move to a position above the
delivery port. Use the <left> and <right> buttons to
position the picker cup to the calibration position.
When properly calibrated, the picker cup should be
1/32” (1 mm) from the port hook.
(See “RVV NG
Product Cup Manual Calibration” in SECTION 4:
VENDER MAINTENANCE for a better description
with illustration.)
Note: Once in the calibration menu, the controller
will home the vend mechanism after the door is
closed.