ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL
48
S.
No.
Fastener, Size, Tool Usage, Precautions, Photos
Aggregate to Assemble/
Instructions
4.42
Bi Starter Cable
Locate the Bi starter
cable in the lever at
handle bar end.
Route the cable correcly,
on the frame tube under
fuel tank.
Assemble the cable
guide, spring & valve bi
starter on the cable.
Insert Valve bi starter
into throttle body and
tighten cable guide to
throttle body.
Assemble fuel tank on
frame as detailed in
section ...
4.43
Clutch Cable
Assembly
Ensure proper location
of inner cable in clutch
lever & outer cable in LH
bracket at handle bar
end.
Ensure proper routing
of cable along the frame
and insert into the
bracket in cover RH.
Assemble outer lock nut
& larger end of rubber
grommet on the adjuster.
Lock inner cable in the
clevis on Cover RH, gently
pull cable outwards till
resistance is felt & thread
out inner lock nut so that
it rests against the bracket
Ensure 2–3 mm clutch
lever free play at handle
bar end by suitably
turning inner lock nut on
cable cable.
Tighten outer lock nut
against cable bracket.
NOTE:
Ensure the rubber grommet
is correctly positioned
between adjuster & clutch
lever on RH cover
Содержание HIMALAYAN EURO IV 2017
Страница 1: ...EURO IV HIMALAYAN VEHICLE SERVICE MANUAL HIMALAYAN HI ...
Страница 3: ...ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL 2 HIMALAYAN VEHICLE VIEWS VEHICLE VIEW LH 02 ...
Страница 4: ...ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL 3 VEHICLE VIEW RH 03 ...
Страница 5: ...ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL 4 VEHICLEVIEW TOP 04 ...
Страница 140: ...139 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL SECTION 14 H HYDRAULIC DISC BRAKES ...
Страница 181: ...180 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL S SECTION 15 ENGINE MANAGEMENT SYSTEM EMS ...
Страница 221: ...220 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL SECTION 16 ELECTRICAL COMPONENTS ...
Страница 271: ...270 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL SECTION 19 WIRING HARNESS ...
Страница 272: ...271 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL WIRING DIAGRAM COMPLETE LS 410 ...
Страница 273: ...272 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL ...
Страница 274: ...273 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL ...
Страница 275: ...274 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL ...
Страница 276: ...275 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL ...
Страница 277: ...276 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL ...
Страница 292: ...291 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL NOTES ...
Страница 293: ...292 ROYAL ENFIELD HIMALAYAN EURO IV VEHICLE SERVICE MANUAL NOTES ...
Страница 294: ...EblT_ 8aY X_W Fhccbeg 8 T _ fhccbeg3eblT_XaY X_W Vb Gj ggXe 3EblT_8aY X_WFhccbeg JXU jjj eblT_XaY X_W Vb ...