13
14
15
Layers
Check compression
Excess lubricant shall be visible
after compression.
The rubber shall expand over the
front fittings.
Rubber layers shall bulge
outwards, if any.
1
Disassembly
1
Reinstallation
2
2
Release the compression by
loosening the screws alternately.
Remove the RS OMD seal.
Clean the sleeve.
Continue the reinstallation from
step 6.
■
Wait 24 hours or longer after installation before exposing the cables/pipes to strain or pressure.
■
Cables shall go straight through the frame.
■
Amendments to these installation instructions are available on www.roxtec.com.
Note