Panel frame

Floor

Back panel

Side panel

5. Securing the walls to the floor

Ensure the panels are sitting square on the floor. Secure using 16 x 63mm screws, screw through the panel frames and into the floor and floor joists. 

Floor joists

50mm

50mm

It is recommended to drill pilot
holes with a 3mm drill for each
screw in this section.

Drill

30mm

4. Apex panels and door header rail and door rebate coverstrips 

Place an apex panel on top of the back panel, make sure the bottom shiplap board of the apex panel fits correctly into the shiplap board of the back panel. Secure by using
2 x 50mm screws, screw up through the top frame of the back panel into the bottom frame of the apex panel. Repeat for front apex. Attach to the front apex the door
header rail using 2 x 50mm screws. Secure it flush to the bottom of the apex framing as shown. The door frame coverstrips are positioned between the floor and the
header rail. Attach the coverstrips flush to the framing of the front panels using 4 x 30mm nails per strip.

6. Roof sections

To the first roof panel secure a roof rafter flush to the right-hand edge of the panel, ensure the correct angled end of the rafter is flush to the short edge of the panel as
shown below. Attach using 4 x 30mm nails, nail through the panel into the rafter. To the second panel attach two rafters in the same way as the first with one down each
side of the panel. To the third panel attach a rafter down the Left-hand edge. Join the three panels together using 2 x 50mm screws per join, Screw through the rafter of
one panel into the rafter of the next as shown. Create a second roof section in the same way as the first.

Ensure rafters
are flush to
the edge of
the panel.

Ensure rafters
are flush to
the edge of
the panel.

Panel 1

Panel 2

Panel 3

Ensure correct
orientation of
angled ends.

30mm

50mm

50mm

50mm

63mm

63mm

63mm

Содержание SS197C

Страница 1: ...x panel 2 7 Door header rail 29 x 29 x 1200mm 1 8 Roof rafter 8 9 Roof panel 1140 x 809mm 6 10 Felt batten 29 x 29 x 1213mm 4 11 Felt batten block 4 12 Left door 1 13 Right door 1 14 Door rebate coverstrip 32 x 12 x 1685mm 2 15 Roof felt 5m 1 16 Roof ridge felt 2 5m 1 17 Coverstrip 12 x 40 x 1710mm 7 18 Window frame 2 19 Window perspex 515x560mm 2 20 Window beading 565mm 4 21 Window beading 500mm ...

Страница 2: ...hown in the diagram using 3 x 25mm screws per hinge stand the hinge end of the window on the window panel making sure it is centred at the top of the window opening Open the hinges and secure them to the window panel frame using 3 x 25mm screws per hinge On the inside of the window panel fit the window stay and its two posts using 6 x 25mm screws as shown in the diagram For the fixed window Put th...

Страница 3: ...ming as shown The door frame coverstrips are positioned between the floor and the header rail Attach the coverstrips flush to the framing of the front panels using 4 x 30mm nails per strip 6 Roof sections To the first roof panel secure a roof rafter flush to the right hand edge of the panel ensure the correct angled end of the rafter is flush to the short edge of the panel as shown below Attach us...

Страница 4: ... upper edge Felt upper edge 30mm 30mm 30mm 9 Coverstrips bargeboards and finials Fit a coverstrip into each corner attach using 3 x 30mm nails per strip The remaining three are used to cover the panel joins on each side and back of the building attach using 3 x 30mm nails per strip Attach bargeboards at the front so that the top edge is flush with the roof line and the two boards meet evenly in th...

Страница 5: ...atment To VALIDATE the guarantee the building must be properly treated with a recognised external wood preserver WITHIN 3 MONTHS of assembly and RE TREATED ANNUALLY thereafter Adequate provision must be made to ensure ground contact is avoided and air is able to circulate underneath the building Placing the building on a concrete pad or slab base is acceptable provided that the building is not all...

Отзывы: