background image

8. Roofing felt

Cut the 5m roofing felt roll into two equal lengths. Place one length over one roof section. At the front and along the lower edge of the roof leave an overhang of felt of
at least 45mm. Fold down the felt along the lower edge and secure to the felt batten using 25 x10mm felt nails evenly spaced. Tension the felt over the roof and secure
along the upper edge using 4 x 10mm felt nails. Repeat this for the second piece of felt on the other half of the roof. Once the two pieces of felt are in place take the 2.5m
ridge felt roll and place over the apex of the roof making sure it sits centrally over the roof ridge and overlaps the other two felt pieces, attach using 25 x 10mm felt nails
evenly spaced, along each lower edge of the third felt. Dress down the ends of all felt pieces and attach to the Batten blocks at the front with 6 x 10mm felt nails. At the
back secure to the apex panel using 6 x 10mm felt nails in the same way. when all the felt is in position trim of any excess.

10mm

Felt

nails

Felt lower edge
Leave at least 45mm of
felt overhanging, to fold
down and cover the
felt batten.

10mm

Felt

nails

10mm

Felt

nails

Felt upper edge

Felt upper edge

30mm

30mm

30mm

9. Coverstrips, bargeboards and finials

Fit a coverstrip into each corner, attach using 3 x 30mm nails per strip. The remaining three are used to cover the panel joins on each side and back of the building, attach
using 3 x 30mm nails per strip. Attach bargeboards at the front so that the top edge is flush with the roof line and the two boards meet evenly in the middle secure using
3 x 30mm nails per board. Repeat for the bargeboards on the back. On the front attach a finial centrally over the join between the bargeboards use 2 x 30mm nails. Repeat
for the finial on the back.

30mm

30mm

38mm

30mm

30mm

Front edge

Left-hand roof section

Right-hand roof section

30mm

7. Roof sections

Secure to lower edge of both roof sections two felt battens using 5 x 30mm nails per batten as shown. Ensure the felt batten are flush to the edges of the panels. Flush to
the front edges of each section attach the roof batten blocks evenly spaced along the edge using 2 x 30mm nails per block. Position the roof panels onto the building, make
sure the top edges are located at the apex and the roof is flush with the back apex. Secure with 8 x 38mm screws per roof section, screw through the roof and into the
panel framing. From inside the building fix a gusset to both sides of the two rafters using 2 x 30mm nails per gusset.

Содержание SS197C

Страница 1: ...x panel 2 7 Door header rail 29 x 29 x 1200mm 1 8 Roof rafter 8 9 Roof panel 1140 x 809mm 6 10 Felt batten 29 x 29 x 1213mm 4 11 Felt batten block 4 12 Left door 1 13 Right door 1 14 Door rebate coverstrip 32 x 12 x 1685mm 2 15 Roof felt 5m 1 16 Roof ridge felt 2 5m 1 17 Coverstrip 12 x 40 x 1710mm 7 18 Window frame 2 19 Window perspex 515x560mm 2 20 Window beading 565mm 4 21 Window beading 500mm ...

Страница 2: ...hown in the diagram using 3 x 25mm screws per hinge stand the hinge end of the window on the window panel making sure it is centred at the top of the window opening Open the hinges and secure them to the window panel frame using 3 x 25mm screws per hinge On the inside of the window panel fit the window stay and its two posts using 6 x 25mm screws as shown in the diagram For the fixed window Put th...

Страница 3: ...ming as shown The door frame coverstrips are positioned between the floor and the header rail Attach the coverstrips flush to the framing of the front panels using 4 x 30mm nails per strip 6 Roof sections To the first roof panel secure a roof rafter flush to the right hand edge of the panel ensure the correct angled end of the rafter is flush to the short edge of the panel as shown below Attach us...

Страница 4: ... upper edge Felt upper edge 30mm 30mm 30mm 9 Coverstrips bargeboards and finials Fit a coverstrip into each corner attach using 3 x 30mm nails per strip The remaining three are used to cover the panel joins on each side and back of the building attach using 3 x 30mm nails per strip Attach bargeboards at the front so that the top edge is flush with the roof line and the two boards meet evenly in th...

Страница 5: ...atment To VALIDATE the guarantee the building must be properly treated with a recognised external wood preserver WITHIN 3 MONTHS of assembly and RE TREATED ANNUALLY thereafter Adequate provision must be made to ensure ground contact is avoided and air is able to circulate underneath the building Placing the building on a concrete pad or slab base is acceptable provided that the building is not all...

Отзывы: