background image

50mm

Floor

Panel frames
rest on floor.

50mm

panel cladding
overhangs floor
edge.

It is recommended to drill pilot holes
with a 3mm drill for each screw.

Drill

Side panel

Fr

o

n

t p

an

e

ls

Large plain panel

Small

panel

Back panel

Large plain panel

50mm

50mm

3. Fixing the wall panels together

Position a large plain panel and a small panel as shown. Note how the panel frames sit on the floor with the panel cladding overhanging the floor edge. Ensure square and
secure using 3 x 50mm screws, screw through the frame of the small panel, into the frame of the large panel. Continue to add panels as shown below securing each one
with 3 x 50mm screws.

Assembly tip.

The window panels
can be interchanged
with any of the large
panels on the
building.

Window panel

Window panel

Small

panel

1. Laying the floor section

Prepare a level area for the shed to sit of no less than 1870mm x 2450mm.  With the three floor panels upside down, join together using 5 x 50mm screws as shown.

25mm

25mm

25mm

View from inside
of window

38mm

2. Fitting the windows

For the opening window, lay a window panel on the floor. Fit two storm proof hinges in the rebates on the longer edge of the window as shown in the diagram using
3 x 25mm screws per hinge, stand the hinge end of the window on the window panel, making sure it is centred at the top of the window opening. Open the hinges and
secure them to the window panel frame using 3 x 25mm screws per hinge. On the inside of the window panel fit the window stay and its two posts using 6 x 25mm screws
as shown in the diagram. For the fixed window, Put the window frame into place on the other window panel, secure into place using 4 x 38mm. Screw through the side
of the window frame into the framework of the window panel. 

Opening window

Fixed window

Secure the hinges
to the longer edge

Important note

To 

"VALIDATE"

the guarantee, adequate provision must be made to ensure ground

contact is avoided and air is able to circulate underneath the building.

Placing the building on a concrete pad or slab base is acceptable provided that the
building is not allowed to sit in pooled water during wet conditions.

If the building is to sit on soil or grass it 

MUST

be erected on pressure treated

wooden 50mm x 50mm or similar bearers 

(These are not supplied in the kit).

Rowlinson Garden Products recommend using pressure treated bearers with all
buildings on any type of base.

It is recommended
to drill pilot holes
with a 3mm drill
for each screw.

Drill

Use this diagram to check the

correct orientation of the corners

Important

Содержание SS197C

Страница 1: ...x panel 2 7 Door header rail 29 x 29 x 1200mm 1 8 Roof rafter 8 9 Roof panel 1140 x 809mm 6 10 Felt batten 29 x 29 x 1213mm 4 11 Felt batten block 4 12 Left door 1 13 Right door 1 14 Door rebate coverstrip 32 x 12 x 1685mm 2 15 Roof felt 5m 1 16 Roof ridge felt 2 5m 1 17 Coverstrip 12 x 40 x 1710mm 7 18 Window frame 2 19 Window perspex 515x560mm 2 20 Window beading 565mm 4 21 Window beading 500mm ...

Страница 2: ...hown in the diagram using 3 x 25mm screws per hinge stand the hinge end of the window on the window panel making sure it is centred at the top of the window opening Open the hinges and secure them to the window panel frame using 3 x 25mm screws per hinge On the inside of the window panel fit the window stay and its two posts using 6 x 25mm screws as shown in the diagram For the fixed window Put th...

Страница 3: ...ming as shown The door frame coverstrips are positioned between the floor and the header rail Attach the coverstrips flush to the framing of the front panels using 4 x 30mm nails per strip 6 Roof sections To the first roof panel secure a roof rafter flush to the right hand edge of the panel ensure the correct angled end of the rafter is flush to the short edge of the panel as shown below Attach us...

Страница 4: ... upper edge Felt upper edge 30mm 30mm 30mm 9 Coverstrips bargeboards and finials Fit a coverstrip into each corner attach using 3 x 30mm nails per strip The remaining three are used to cover the panel joins on each side and back of the building attach using 3 x 30mm nails per strip Attach bargeboards at the front so that the top edge is flush with the roof line and the two boards meet evenly in th...

Страница 5: ...atment To VALIDATE the guarantee the building must be properly treated with a recognised external wood preserver WITHIN 3 MONTHS of assembly and RE TREATED ANNUALLY thereafter Adequate provision must be made to ensure ground contact is avoided and air is able to circulate underneath the building Placing the building on a concrete pad or slab base is acceptable provided that the building is not all...

Отзывы: