Use bellow
(12)
to load a pressure of 110 or 150 mbar into the test system (zero level in the
upper tube element).
Î
Close
connecting valve C
to avoid a loss in pressure.
Î
Wait 10 minutes for loaded air and water temperatures to equalize.
Prolong period of temperature equalization if temperatures fluctuate greatly!
Î
Carry out test over a period of ten minutes. The indicated pressure should not drop over a 10-
minute period.
5 Operating and performing leakage tests with the ROTEST GW 150/4
5.1
Bearing test of gas fittings pursuant to 1*
The following aspects must be taken into careful consideration:
•
All bearing tests are to be performed on newly fitted gas pipe systems without fixtures.
•
All pipe openings must be sealed off with plugs, caps, blanks or blind flanges for the duration
of the test.
•
The system must be isolated from all other gas carrying systems.
•
Carry out all initial tests before the pipes are plastered or covered and the joints are coated or
jacketed.
•
If the test is to be carried out at the gas meter end of the pipe system, use the threaded
supply-end cap
(22)
to seal off the pipe system.
Complete test as follows:
Î
Close all cut-off valves on your ROTEST GW 150/4.
Î
Insert connecting hose
(6)
to
connecting valve A
. An auditable sound is heard when hose
and valve nipple are properly locked.
Î
Insert an appropriate test plug into the open end of the pipe and seal off end by turning the
wing nut until the pipe is sealed tight.
Î
Insert the open end of the connecting hose
(6)
to the valve on the test plug.
Î
Use the hand pump to load a pressure pursuant to
1*
to the pipe system.
Î
Wait 10 minutes for loaded air and water temperatures to equalize.
Prolong 10-minute period of temperature equalization if temperatures
fluctuate greatly. The equalization period can last up to two hours!
Î
Carry out the test over a period prescribed by
1*
. Over this period the pressure indicated must
not drop.
5.1.1 Leak test of gas fittings pursuant to 1*
The following aspects must be taken into careful consideration:
•
The leak test gas fitting includes all fixtures, but not gas appliances as well as the associated
control and safety devices.
•
The system must be isolated from all other gas carrying systems.
•
Carry out all leak tests before the pipes are plastered or covered and the joints are coated or
jacketed.
•
The gas meter may be included in leak tests.
•
If the test is to be carried out at the gas meter end of the pipe system, use the threaded
supply-end cap
(22)
to seal off the pipe system.
Complete test as follows:
Î
Close all cut-off valves on your ROTEST GW 150/4.
Î
Insert connecting hose
(6)
to
connecting valve B
. An auditable sound is heard when hose
and valve nipple are properly locked
.
Î
Insert an appropriate test plug into the open end of the pipe and seal off end by turning the
wing nut until the pipe is sealed tight
1*
Statutory regulations in the country of use or the respective manufacturer and facility instructions and guidelines
Содержание ROTEST GW 150/4
Страница 2: ...7 11 5 16 17 15 14 36 3 21 35 22 12 10 6 37 13 9 8 2 D C B A Overview A ...
Страница 159: ...157 ...
Страница 162: ...160 NOTES ...
Страница 163: ...161 NOTES ...